Similar Projects
UT Erfo Uinta NF 70014(1) Santaquin Canyon Road
Design
$1,000,000 to $4,000,000 est. value
Santaquin, UT

Paving & Site/Civil-UTNG CW UTES Org Parking Improvements
Infrastructure
Bidding
$1,550,000 est. value
Bluffdale, UT 84065

Nebo Loop Road Re-Alignment Project
Infrastructure
Bidding
Provo, UT 84606

Construction of the 2020 Provo City Streets Rehabilitation Project
Post-Bid
Provo, UT 84606

US-89; Improve Mobility/Safety in Orem City Limits
Post-Bid
$1,500,000 to $3,000,000 est. value
Orem, UT 84057

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

Center Street Widening
Results
Spanish Fork, UT 84660

SR-51 Spanish Fork Parkway Intersection Improvements
Term Contract
Bidding
Spanish Fork, UT 84660

2020 Eagle Mountain Slurry Seal Project
Post-Bid
Eagle Mountain, UT 84005

2020 Micro-Surfacing Project
Results
$350,000 to $400,000 est. value
Orem, UT 84057

Cedar Fort Road Improvements Project
Infrastructure
Bidding
Cedar Fort, UT

Pave the Existing Road to the Green Waste Pad
Post-Bid
Lindon, UT 84042

2020 Slurry Project
Results
$500,000 to $550,000 est. value
Orem, UT 84057

2020 Roadway Project
Post-Bid
$2,200,000 to $2,400,000 est. value
Orem, UT 84057

Moyle Drive Roadway Improvement Project
Results
Alpine, UT

Last Updated 06/07/2021 09:44 AM
Project Title

2021 Roadway Project

Physical Address View project details and contacts
City, State (County) Orem, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,400,000 to $2,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes 7,940 SY of 3” profile mill with 3” overlay, 12,377 SY of 3.5" travel lane mill and shoulder mill with 3.5? Pave, 79,598 SY of 2” edge mill and 2” overlay (1/2” PG 64-34), 1,363 SY of 2” profile mill and 2” overlay, 10 modified ADA ramps, 9 speed tables, 510 LF type B3 concrete curbing, 1585 sf of stamped concrete, 237 utilities brought to finished grade, 3 existing monuments brought to finished grade, 850 CY of granular borrow, 1933 LF OF 2’ curb and gutter, 244 SF of 4” concrete with 4” UTBC, 118 SF of 7” concrete with 4” UTBC, 2 dumpster enclosures, 2 drive approaches, 170 LF of cross gutter, 19 storm drain structures, 425 LF 12” SDR35 PVC, 220 LF of 3” PVC conduit for irrigation install 5 new streetlights, junction boxes, and 455 LF of power conduit. SITE OF WORK: The site of the WORK is located at 800 E (From 800 N to Center St.), Palisade Drive (From 800 N to Center St.), 2000 S (From Sandhill Dr. to 140 East), Main St. (From 400 S to 800 S), Orem Fitness Center south parking lot on 165 S 600 W, and City Center Park south parking lot on 300 E Center St.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents