Similar Projects
Earlham Lagoon Upgrades
Renovation
Results
Earlham, IA

Digestor Cleanout
New Construction
Results
$500,000 est. value
Sioux City, IA 51106

WWTF Clarifier Improvements
Renovation
Results
Milford, IA

WWTF Improvements UV Disinfection
Renovation
Results
Walford, IA

Influent Rake and Screen Replacement
Renovation
Results
$1,800,000 est. value
Iowa City, IA 52240

Iowa Wastewater Treatment Facility 2021
New Construction
Bidding
$1,805,000 est. value
Miles, IA

Wastewater Treatment Plant Improvements 2021 - Aerobic Digester No. 1 Replacement
Renovation
Results
Fairfield, IA 52556

WRF Primary Sludge Piping Replacement - 2021
Renovation
Results
Less than $1,275,000 est. value
Des Moines, IA 50317

Slater WWTP Improvements
Renovation
Post-Bid
Less than $6,000,000 est. value
Slater, IA

WRF Aeration Basin Sensor Improvements
New Construction
Results
Less than $1,588,000 est. value
Des Moines, IA 50317

Wastewater Treatment Facility Improvements
Renovation
Bidding
$3,200,000 est. value
Fort Atkinson, IA

Wastewater Treatment Plan Improvements
Renovation
Bidding
$2,686,000 est. value
New Albin, IA

Last Updated 01/13/2022 02:43 PM
Project Title

Wastewater Treatment Plant Improvements 2020

Physical Address View project details and contacts
City, State (County) Jesup, IA   (Buchanan County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will include but is not limited to the following improvements: 1. Wastewater Treatment Plant site earthwork, approximately 30,000 CY, including site grading, and excavation for structure foundations. 2. Construction of a new Fluidyne ISAM SBR activated sludge wastewater treatment plant. 3. Construction of new Wastewater Plant Building housing plant power distribution, controls, laboratory, blowers, and Screening equipment. 4. Construction of a new UV Disinfection Building. 5. Construction of new flow control structure and treatment plant return lift station. 6. Site work, site restoration, crushed stone paving, miscellaneous piping, and other miscellaneous work. 7. Standby power systems at the Wastewater Treatment Plant. 8. Electrical, Instrumentation and Controls.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents