Similar Projects
Oakland Avenue Trail Improvements
Infrastructure
Bidding
Nappanee, IN 46550

2021 Downtown Improvements
Infrastructure
Bidding
Lewisville, IN

Asphalt Repairs
Post-Bid
Angola, IN 46703

Sidewalk Installation/Repair on Scattered Site ECHA Properties
Post-Bid
East Chicago, IN 46312

Bike and Pedestrian Facilities
Results
IN

Curb and Gutter, Sidewalk, and ADA Ramps
Results
Indianapolis, IN 46204

Mixed Use Development
New Construction, Infrastructure - 70,150 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Columbus, IN

Silver Creek Trail
Infrastructure
Bidding
New Albany, IN

Recover Forward Sidewalk
Post-Bid
Bloomington, IN 47402

Downtown Streetscape Revitalization
Results
Bremen, IN 46506

Ohio River Greenway Trail Extension
Infrastructure
Bidding
New Albany, IN

South Parking Lot and Entrance Lane Sealcoating
Post-Bid
Indianapolis, IN 46200

2020 CCMG Paving & Second Street Resurfacing & Sidewalks
Results
$421,951 est. value
Orleans, IN 47452

Silver Creek Kayak Launch
Infrastructure
Bidding
New Albany, IN

Installation of A New Sidewalk
Post-Bid
Bloomington, IN 47402

Last Updated 12/09/2021 01:25 AM
Project Title

ADA Sidewalk Ramp Construction

Physical Address View project details and contacts
City, State (County) IN   (Starke County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Starke County - Along Various Roads Throughout the Town of North Judson Ph 3 Section No : 1 0001 105-06845 Construction Engineering 1.00 Ls 0002 109-08359 Liquidated Damages 1.00 Dol 0003 109-08360 Contract Liens 1.00 Dol 0004 109-08443 Quality Adjustments, Temporary Traffic Control Devices 1.00 Dol 0005 109-08444 Quality Adjustments, Failed Materials 1.00 Dol 0006 109-11362 Quality Adjustments, Failure to Maintain Temporary Erosion and Sediment Control Measures 1.00 Dol 0007 110-01001 Mobilization and Demobilization 1.00 Ls 0008 202-02274 Curb, Concrete Integral, Remove 50.00 Lft 0009 202-52710 Sidewalk Concrete, Remove 165.00 Sys 0010 205-12108 Stormwater Management Budget 2400.00 Dol 0011 205-12616 Stormwater Management Implementation 1.00 Ls 0012 604-06070 Sidewalk, Concrete 107.30 Sys 0013 604-08086 Curb Ramp, Concrete 90.30 Sys 0014 604-12083 Detectable Warning Surfaces 21.00 Sys 0015 605-06090 Curb, Integral Concrete 96.00 Lft 0016 621-01004 Mobilization and Demobilization for Seeding 1.00each 0017 621-06560 Mulched Seeding U 31.80 Sys 0018 801-06640 Construction Sign, a 60.00each 0019 801-06645 Construction Sign, B 16.00each 0020 801-06775 Maintaining Traffic 1.00 Ls 0021 801-07118 Barricade, Iii-a 46.00 Lft

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents