Similar Projects
Silver Buffalo Casino and Food Distribution Building
Term Contract, Alteration
Design
$500,000 to $1,000,000 est. value
Anadarko, OK 73005

Citywide Arterial Microsurfacing
Infrastructure
Bidding
$4,000,000 est. value
Tulsa, OK

Grade, Drain, and Surface County Roads (Lyle Road/ Lawter Road)
Infrastructure
Bidding
$1,845,683 est. value
Weatherford, OK 73096

Fy23 Kc46a Pavements
Term Contract
Post-Bid
$10,000,000 est. value
Tulsa, OK

Arkansas Road Improvements and Miscellaneous Pavement Repairs
Infrastructure
Post-Bid
Tulsa, OK 74127

Resurface (Asphalt) and Bridge Rehabilitation
Results
Anadarko, OK 73005

Resurface (Asphalt)
Results
Randlett, OK

Quapaw Nation Marshal Services Parking Lot
Infrastructure, Alteration
Construction
Quapaw, Quay, OK

Quapaw Nation Marshal Services Parking Lot
Infrastructure, Alteration
Construction
Quapaw, Quay, OK

Exterior Roadway Regrading at the New Hospital Site
Infrastructure
Bidding
$200,000 est. value
Purcell, OK

Interchange Modification, Pavement Widening, and Bridge Turner Turnpike/i-44/Sh-66
New Construction, Infrastructure
Post-Bid

Resurface (Asphalt)
Results
OK

Apache Tribe of Oklahoma, Silver Buffalo Casino and Food Distribution Building Parking Lot Project
Alteration
Bidding
$1,000,000 est. value
Anadarko, OK 73005

Street Overlay - First Half of 2022
Infrastructure
Post-Bid
Woodward, OK

Resurface (Asphalt)
Results
Manitou, Snyder, OK

Last Updated 05/18/2022 12:07 AM
Project Title

Third Street Reconstruction Walnut Avenue to Oklahoma Avenue

Physical Address View project details and contacts
City, State (County) Ponca City, OK 74601   (Kay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all tools, materials and labor and performing the work necessary to reconstruct Third Street from Walnut Avenue to Oklahoma Avenue. The work includes the replacement of over 540 linear feet of existing 4 inch water line with new 6 inch water line. Additionally, the work includes the replacement of over 600 linear feet of storm sewer pipe ranging in size from 12 inch diameter up to 42 inch diameter pipe using primarily corrugated polypropylene pipe. There are several new storm sewer manholes and junction boxes included in the project as well. The street is a 40 foot wide paving section of deteriorated brick and concrete pavement to be replaced with all new concrete pavement. The street reconstruction work includes 2,716 square yards of 7 inch dowel jointed concrete pavement, 2,850 square yards of 8 inch Type A Aggregate base and the associated curb and gutter, driveways and sidewalks.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents