Similar Projects
State Phase II B Boiler Replacement at Marcy Houses
Alteration
Bidding
$700,000 est. value
New York, NY

Admin Boiler Upgrade
Term Contract
Bidding
New York, NY

Service and Maintenance of Advanced Boiler Mgt Systems
Alteration
Post-Bid
New York, NY

Gansevoort Peninsula Building Mechanical
Alteration
Post-Bid
New York, NY

Repair and Replace of Heating Pipe and Mechanical Equip Insulation - Citywide
Alteration
Results
New York, NY 10065

Boiler Tube Replacement Services
Alteration
Results
New York, NY

PS102M - Boiler Conversion, Climate Control
Alteration
Bidding
$4,000,001 est. value
New York, NY 10029

Pier 97 Building Mechanical
Alteration
Post-Bid
New York, NY 10014

Metro North Houses Mobile Boiler Stack
Alteration
Results
New York, NY 10029

PS079M - Horan School - Boiler Conversion, Climate Control
Alteration
Bidding
$4,000,000 est. value
New York, NY 10035

Consultant Services, Boiler Maintenance Services
Alteration
Post-Bid
New York, NY

Domestic Water Heaters
Alteration
Results
$250,000 to $500,000 est. value
New York, NY 10035

HS440Q - Forest Hills High School - Water Infiltration at Chimney
Alteration
Bidding
$500,001 to $1,000,000 est. value
New York, Queens, NY 11375

Requirements Contract for Mechanical Materials
Alteration
Post-Bid
New York, NY

WellPoint Rehabilitation Lenox Avenue Line
Alteration
Results
$1,000,000 to $5,000,000 est. value
Manhattan, NY

Last Updated 05/23/2022 01:56 PM
Project Title

Preventive Maintenance, Performing Inspections and/or Testing of the Equipment, Troubleshooting, Repair, Clean and Tune-up Boilers

Physical Address View project details and contacts
City, State (County) New York, NY   (New York County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all the necessary labor, parts, materials and equipment for performing Preventive Maintenance, performing Inspections and/or Testing of the equipment, troubleshooting, repair, clean and tune-up boilers fueled by No.2 oil, natural gas, digester gas and or any combination thereof. The work also includes associated systems but not limited to burners, boiler control systems, furnaces, fuel oil pumps, atomizing compressors, associated fuel piping and accessories, draft damper and controls, gas train components, low water cut offs, pipes, valves, blending pumps, removal and reinstallation blower motors, incidental repairs to refractory, tubes.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents