Similar Projects
HVAC Improvements at Terminal 1 Bridge/Rotunda
Alteration
Bidding
Las Vegas, NV

Smith's Grocery Store #366
Post-Bid
Henderson, NV 89012

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Fume Hood
Post-Bid
Las Vegas, NV

Support Services Building Roofing Replacement
Results
Henderson, NV 89011

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

Roof Recoating at Levy Gardens
Post-Bid
Las Vegas, NV 89106

Roofing Replacement
Results
$282,000 est. value
Las Vegas, NV 89121

Cooling Tower Maintenance and Repair Services
Post-Bid
North Las Vegas, NV 89121

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$185,000 est. value
Las Vegas, NV

Last Updated 06/16/2021 04:17 PM
Project Title

Replace HVAC Components and Roof - Elizabeth Wilhelm Elementary

Physical Address View project details and contacts
City, State (County) North Las Vegas, NV 89031   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of Cooling Towers and components, Chillers and components, Boilers/Furnaces and components, HVAC Controls, Roof Exhaust Fans, Ceiling Exhaust Fans, Rooftop Package Unit for ER; Further, the following HVAC repairs/upgrades are recommended: Ductless split unit to supplement the kitchen HVAC, Emergency Shower in Mechanical Room, Water and Air Balance (TAB), Equipment repair to extend life of MZU's, Remove Evaporative coolers from Chiller and Boiler Rooms, Provide Ventilation for Chiller Room, Provide chilled and hot water fan coil for Boiler Room, Remove Hot Water Circulating Pump at each Multi-Zone Units, Replacement of AHU Coils and relief fans (if required) and Duct Cleaning.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents