Similar Projects
Last Updated | 08/29/2022 08:15 AM |
Project Title | 2022 Overflow Fence Construction |
Physical Address | View project details and contacts |
City, State (County) | Roswell, NM 88201 (Chaves County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $93,888 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Aug 23, 2022 Contract Award Number: 140L0622P0027 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: YN9JX6KJJA75 Contractor Awarded Name: GUADALUPE MOUNTAIN FENCING LLC Contractor Awarded Address: Carlsbad, NM 88220-9479 USA Base and All Options Value (Total Contract Value): $93888.25 Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract Place of Performance: 45 Days after receipt of Notice to Proceed Type of Construction: Building FAR Magnitude: Between $100K and $250K NAICS: 238990 SIZE STD: $16.5M SET-ASIDE: Small Business Quote Submittal Information: Due Date: 4 August 2022 at 2:00 PM Mountain Time In accordance with this Solicitation Part IV - Representation and Instructions Site Visit: 11 July 2022 / 8AM Local Time (See clause instructions below / FAR 52.236-27) Questions Due Date: 19 July 2022 at 2:00 PM Mountain Time GENERAL (a) The Bureau of Land Management (BLM) is seeking quotations for construction services as attached in the accompanying statement of work. The BLM intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13. A single contract award will be made to the Offeror whose quotation represents the lowest price technically acceptable. The offeror's submission must demonstrate the ability to satisfy all technical requirements set forth in this RFQ. (b) The Government will not award any contract if the resulting contract would not represent a "best value" to the Government. (c) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quotation. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to adhere to quotation requirements, at the time of submission, may result in the quotation being unacceptable to the Government and eliminated from consideration for award. It is the responsibility of offerors to ensure their quote is received by the recipient and by the due date and time. (d) Offerors are cautioned to submit adequate information to enable the Government to fully ascertain each offeror's capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ). (e) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the Contracting Officer in writing (email is the preferred method) with supporting rationale by the question deadline specified on the cover page of this document. (f) This RFQ does not commit the Government to any costs incurred in the preparation and submission of a quote or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the Offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this RFQ does not constitute an award commitment on the part of the Government. (g) Quotation must be valid for a minimum of 60 days. (h) Respondents must complete registration utilizing the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/. The Government will obtain respondent representations and certifications through this system. (i) Award is subject to and based on the availability of funds. This project is currently funded based upon an independent cost estimate. (j) All questions should be emailed directly to the Contracting Officer by the posted due date. Only written RFI's will be considered and responded to by the Government. BLM responses to RFIs will be posted as an amendment to the solicitation. Respondents shall not contact any government personnel related to this requirement other than the Contracting Officer. (k) The successful Offeror shall submit appropriate Alternative Payment Protection in accordance with clause 52.228-13 within 10 days of contract award. For any quotes in excess of $150,000.00, respondents will be required to provide an additional performance bond and shall include the cost of the performance bond as part of their quote. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |