Similar Projects
Last Updated | 03/22/2022 04:46 PM |
Project Title | Laurel Drive North Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | West Bend, WI (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish and Install Sanitary Sewer Main and Laterals 1,900 LF Furnish and Install Sanitary Sewer Manhole 11 EA Furnish and Install Water Main and Services 1,550 LF Furnish and Install Hydrant Assembly 4 EA Furnish and Install Storm Sewer Main and Lead 1,500 LF Furnish and Install Storm Sewer Underdrain 2,100 LF Furnish and Install Storm Sewer Manhole 13 EA Furnish and Install Storm Sewer Catch Basin 10 EA Furnish and Place Concrete Curb and Gutter 2,350 LF Furnish and Place 4-Inch Concrete Sidewalk 1,900 SF Furnish and Place 6-Inch Concrete Sidewalk & Driveway 3,800 SF Furnish and Place Base Aggregate Dense 2,075 CY Furnish and Place Breaker Run, Incl. Overexcavation 1,350 CY Furnish and Place Asphalt Pavement, 4-Inch 1,260 TN Furnish and Place Topsoil, Seed, Fertilizer, Mulch and Water 1,875 SY |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |