Similar Projects
Watermark - Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

Ridgewood Hills
New Construction
Conception
Fort Collins, CO 80525

Sanctuary on the Green (formerly known as Sanctuary West)
New Construction - 90,195 SF
Design
Fort Collins, CO 80521

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Oasis Clubhouse Remodel
Renovation
Bidding
Grand Junction, CO 81501

Willow Bend Community
New Construction
Post-Bid
Fort Lupton, CO 80621

Gilpin County Community Center Campus Improvements
New Construction
Post-Bid
Black Hawk, CO 80422

Ellen Hansen Smith Center Rehabilitation Project
Results
Paonia, CO

2020 Salida Community Center Reconstruction
Results
Less than $102,744 est. value
Salida, CO 81201

The Collins / Brick Stone on Harmony
New Construction - 202,000 SF
Construction
$10,000,000 CJ est. value
Fort Collins, CO

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Cinquefoil Lane Apartments
New Construction
Pending Verification
Fort Collins, CO 80528

Kaleidos
New Construction
Conception
Colorado Springs, CO 80916

Black Canyon Boys & Girls Club Facility
New Construction - 13,000 SF
Design
$4,700,000 est. value
Montrose, CO 81401

Reported 04/12/2022 12:00 AM
Project Title

Haymaker Clubhouse Construction for Simulator

Physical Address View project details and contacts
City, State (County) Steamboat Springs, CO 80487   (Routt County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The renovation of the Haymaker Golf Course clubhouse in preparation for installation of a golf simulator room. Included with this project is the construction of a non-load baring wall with access door and low voltage wiring, demolition and re-location of a trophy cabinet and cosmetic pillars, and addition of a new bar top in the restaurant area.

Details

Clubhouse/Social Club, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents