Similar Projects
Caulks Creek a Pump Station (P-750) Improvements
Renovation
Bidding
Less than $8,190,000 est. value
Saint Louis, MO

Eldon Residential and Commercial Demolition
Demolition
Bidding
Eldon, MO

Prequalification for Demolition Contractors
Post-Bid
Independence, MO

On-Call Demolition of Structures
Demolition, Term Contract
Post-Bid
Saint Louis, MO

Building Demolition and Site Cleanup
Demolition
Results
Springfield, MO

Demolition Package
Demolition
Results
$800,000 est. value
Rolla, MO 65401

Nismark Apartments
New Construction, Demolition
Pending Verification
Saint Louis, MO 63127

Lamberson Memorial Conservation Area Demolition
Demolition
Bidding
Huggins, MO

Bellerive Hall Demolition
Demolition
Post-Bid
Saint Louis, MO 63121

SEC - BOM 1, 2 and 3 - Demolition Package
Demolition
Results
$800,000 est. value
Rolla, MO

Wastewater Treatment Facility Improvements at Jackson County Public Works Vehicle Service Center
New Construction
Bidding
Grain Valley, MO

House Demolition
Demolition
Post-Bid
Jackson, MO

Removal of Whirlpool at Community Center
Results
Overland, MO 63114

Grant Avenue Bridge Hydro Demolition
Demolition
Bidding
Springfield, MO

C9 Garage Demolition at Cervantes Convention Center
Demolition
Post-Bid
$2,169,802 est. value
MO 63101

Last Updated 10/18/2021 08:45 AM
Project Title

Wastewater Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Laredo, MO   (Grundy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Demolition, Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sludge judging and testing, demolition of an existing pump station and construction of a new pump station, sludge removal in the existing lagoon, replacement of existing valves and baffles in the existing lagoon, installation of a new tablet fee chlorination/dechlorination system at the lagoon.

Details

Sewage Treatment Plant, New Construction, Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents