Similar Projects
Paul VI Site Redevelopment for Mixed Use Community
New Construction, Renovation, Demolition - 64,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Fairfax, VA 22030

Low-Level Drain Gate Replacement and Toe Drain Installation
Renovation
Design
$275,000 to $300,000 est. value
Ruther Glen, VA 22546

Floodproofing Projects for the Stormwater Division
Post-Bid
$50,000 est. value
VA

Wetlands, Stream Maintenance Monitoring and Related Services
Post-Bid

Cedar Grove Cemetery Retaining Wall
Results
Portsmouth, VA

Restoration Project of Accontick Creek
Results
Fairfax, VA

The Fashion Centre at Pentagon City
Renovation, Addition - 51,000 SF
Construction
$30,000,000 est. value
Arlington, VA 22202

Jennell Property
New Construction
Construction
$5,000,000 est. value
Chantilly, VA 20151

SIP East Bulkhead Refurbishment and Mod Boatyard
Results
Newport News, VA

Village at Middletown Site Development - Phase 1
New Construction
Construction
Middletown, VA 22645

Burtwood Lane Drainage Project
Results
Richmond, VA

Mount Vernon East Lawn Slope Repairs
Renovation
Construction
$1,000,000 est. value
Mount Vernon, VA 22121

Z--Repair Storm Damaged Canal Lock Historic Patowmack
Results
McLean, VA 22102

Beautiful Run Dam 11 - Training Dike and Plunge Pool Construction
Construction
VA 22701

Aluminum Pipe Culvert With Structural Plate Headwalls Pittsylvania County
Results
VA

Reported 02/01/2019 12:00 AM
Project Title

Installation of Two Landfill Gas Interception / Venting Trenches

Physical Address View project details and contacts
City, State (County) Surry, VA 23883   (Surry County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Work will include erosion and sediment control measures, excavation of trenches in soil, installation of geomembrane liner material within the trenches, installation of PVC vent piping, backfilling trenches and restoration of disturbed areas.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents