Similar Projects
Clover Hill Area Schools Pedestrian Improvements
Bidding
Less than $598,000 est. value
Chesterfield, VA

Sidewalk Trip Hazard Removal
Term Contract
Post-Bid
Buchanan, VA 24066

Parking Area Upgrades
Post-Bid
Tasley, VA

Site Repairs and Improvements
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Central Avenue Streetscape Improvements
Results
$1,600,000 est. value
Staunton, VA

Construction - Repave Parking Lot, Charlottesville VA
Post-Bid
Charlottesville, VA 22903

Construct Shared-Use Path
Results
Less than $922,000 est. value
VA

2018 Sidewalk Improvements Near Tobacco Trail
Post-Bid
Lawrenceville, VA

Streetscape Improvements at Four Intersections
Results
Less than $2,614,000 est. value
Arlington, VA

Ivy Road Sidewalk Improvements
Post-Bid
$1,000,000 to $3,000,000 est. value
Charlottesville, VA 22902

Operations Center Expansion Parking Lot Expansion
Results
$302,189 est. value
Charlottesville, VA

Sidewalk Repair - Edinburg Residency
Term Contract
Post-Bid

Commercial Entry Lane Expansion at Richmond International Airport
Results
Richmond, VA

Security Measures at North Drive and 9th Street Sidewalk Improvements Projects
Post-Bid
Richmond, VA 23224

FY 20 Package 1 (Northside) Citywide Sidewalk Improvements
Term Contract
Results
Richmond, VA 23219

Last Updated 05/12/2021 11:37 AM
Project Title

Albemarle County Sidewalks Improvements

Physical Address View project details and contacts
City, State (County) VA   (Albemarle County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $3,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated construction cost range for this project is $1000000-$3000000. Sidewalks Improvements along portions of Rio Road, Avon Street Extended, and 250W-Rockfish Gap Turnpike. The project is generally described as approximately 7,804 feet of sidewalk, curb & gutter, storm drainage, and paving along three different VDOT roadways in Albemarle County: Rio Road, Rockfish Gap Turnpike, and Avon Street Extended.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents