Similar Projects
Heerf III Hvac Updates for Covid Prevention Engineering Intervention Touchless Doors Nahc Campus Hinds Community College
Renovation
Design
$800,000 CJ est. value
Raymond, MS 39154

Scott Hall - 2022 HVAC Renovations
Alteration
Bidding
Decatur, MS

Tylertown High School Hvac Renovations (ESSER)
Renovation
Sub-Bidding
$900,000 CJ est. value
Tylertown, MS 39667

AC Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Pascagoula, MS 39595

Aberdeen High School HVAC Renovations
Alteration
Post-Bid
Aberdeen, MS 39730

Church Street School HVAC Replacement 2021
Alteration
Post-Bid
Tupelo, MS 38804

HVAC Maintenance at City of Brookhaven Owned Facilities
Results
Brookhaven, MS

ESSER II Funded HVAC Replacement and Other Projects
Alteration
Results
Cleveland, MS

Middle School HVAC Improvements
Alteration
Post-Bid
Newton, MS 39345

Gymnasium HVAC Renovations
Alteration
Results
Lauderdale, MS

Circuit Clerk HVAC Improvements
Alteration
Post-Bid
Greenville, MS

City Hall HVAC Repairs
Alteration
Results
$59,490 est. value
Long Beach, MS 39560

Petal High School Gym HVAC and Cooling Tower Replacement
Alteration
Post-Bid
Petal, MS 39465

HVAC Upgrades
Alteration
Results
Carrollton, MS 38917

North Pike High School Gym HVAC Replacement
Alteration
Post-Bid
Summit, MS 39666

Last Updated 05/04/2023 06:33 PM
Project Title

NEMCC Burgess Hall HVAC Renovation

Physical Address View project details and contacts
City, State (County) Booneville, MS 38829   (Prentiss County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

BID GUARANTEE: Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening PERFORMANCE-PAYMENT BOND: A 100% Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. A pre-bid conference may be held prior to the bid letting.The Architect will notify planholders of the date, time and location of the pre-bid conference. All planholders are encouraged to attend. The Owner reserves the right to reject any or all bids and to waive irregularities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents