Similar Projects
Locker Room Renovation Phase 2
Renovation
Bidding
$670,000 CJ est. value
Austin, MN 55912

2022 Safe Routes to Schools Sidewalk Improvements
Infrastructure
Bidding
$450,000 CJ est. value
Breckenridge, MN 56520

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

Concrete Pavement Rehabilitation, Bituminous Surfacing
Results
MN

2021 Miscellaneous Concrete Repairs and Installations
Results
$30,000 est. value
Columbia Heights, MN

Mora New High School - Work Scope 2 Only-Cast In Place Concrete
New Construction - 170,000 SF
Construction
$10,000,000 CJ est. value
Cloquet, Mora, MN 55051

Mora New High School - Work Scope 2 Only-Cast In Place Concrete
New Construction - 170,000 SF
Construction
$10,000,000 CJ est. value
Cloquet, Mora, MN 55051

Bid Package 2 - North High School CTE Renovations
Addition, Demolition, Infrastructure, Renovation
Bidding
$25,000,000 CJ est. value
Minneapolis, MN 55411

Petroleum Infiltration Waterproofing and Concrete Work
Alteration
Post-Bid
Long Prairie, MN 56347

Garage and Basement Slabs
Renovation, Alteration
Results
Minneapolis, MN

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Upgrade Radio Communications at MCF Willow River
Renovation
Bidding
$685,000 CJ est. value
Willow River, MN 55795

Cellular Concrete
Term Contract
Post-Bid
Minneapolis, MN

Landfill Precast Wall Repair
Alteration
Results
$150,000 to $175,000 est. value
Dundas, MN 55019

Last Updated 11/23/2022 07:05 AM
Project Title

Regional Treatment Center Phase 3 Exterior Stabilization Project

Physical Address View project details and contacts
City, State (County) Fergus Falls, MN 56537   (Otter Tail County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,254,400 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Fergus Falls Regional Treatment Center Phase 3 Exterior Stabilization Project In general, this Project will consist of exterior stabilization of Building 1, Building 22, Building 23, Building 24, Building 26, Building 27, Building 28, and Building 29. This will include covering ground and first floor windows and doors with treated plywood painted to match existing adjacent wall color; removal of exterior mechanical equipment, associated piping and conduits, concrete pads, and chain link fence; and adjacent equipment, electrical substation, utility tunnel between Building 25 and Building 32, removal of invasive vegetation growing next to the buildings; selective interior demolition inside Building 1 to open the main stair to floors 1 through 4; repair of asphalt shingles on Building 23, Building 27, and Building 29; replacement of single-ply membrane roofing system on Building 27; installation of new prefinished metal downspouts where existing downspouts are missing and addition of downspout extensions at grade to direct rainwater away from Buildings. This project will have alternates which will include mold abatement in Building 1, temporary mechanical ventilation system in Building 1, full replacement of asphalt roof shingles and underlayment on Buildings 23, 27, and 29, and removal of all window-mounted air conditioning units and housings. Direct inquiries to the Architect's Project Manager, Bruce Paulson, at (612) 712-2108. This will be the only opportunity to tour the building prior to the Bid due date. Indoor Air Quality Notice: The indoor air quality inside all buildings at this campus is poor. Anyone wishing to tour the interior of Building 1 or access the Building 27 flat roof during the mandatory pre-bid meeting MUST provide and wear their own N95 face mask and/or respirator while inside the buildings. BID SECURITY: No Bid will be considered which is not accompanied by a cash deposit, certified check, cashier's check, or satisfactory bid bond payable to the City of Fergus Falls in an amount of not less than 5 percent of the Bid amount. Bids may not be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The City of Fergus Falls, Minnesota, reserves the right to reject any and all Bids, waive any minor irregularities in bidding, or to accept the Bid or bids which best serve the interest of the City of Fergus Falls.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents