Similar Projects
M-5 Maintenance Facility Access Improvements
Infrastructure
Bidding
$400,000 est. value
Schaumburg, IL 60168

174th Street, 66th Court and 173rd Place Roadway Improvements and Water Main Replacement
Infrastructure
Bidding
$625,000 est. value
Tinley Park, IL 60487

Terminal 5 Landside & Parking Improvements - BP 8 - TP 21 - Asphalt & Concrete Paving
Infrastructure, Alteration
Sub-Bidding
Chicago, IL 60666

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Smart Overlay, Class D Patching and ADA Improvement
Results
Brookfield, IL 60513

(6.2-Mile) Cleaning and Sealing Longitudinal Cracks in the Existing Concrete Pavement
Results
Chicago, IL 60007

PCC Driveway Pavement
Infrastructure
Bidding
$500,000 est. value
Skokie, IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

2022 Alley Improvements
Infrastructure
Bidding
$529,000 est. value
Evanston, IL

Pavement W/ Hot-Mix Asphalt
Post-Bid
Homewood, IL

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

2022 Street Patching Program
Infrastructure
Bidding
$300,000 est. value
River Forest, IL

Pavement Resurfacing
Post-Bid
Western Springs, IL

Reported 05/26/2022 12:00 AM
Project Title

German Church Road Over Flag Creek

Physical Address View project details and contacts
City, State (County) Willow Springs, IL 60480   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $828,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Improvement of the German Church Road Bridge over Flag Creek includes removal and replacement of the strip seal expansion joint, removal of the latex concrete overlay and replacement with HMA overlay and a waterproofing membrane system, guardrail removal and replacement, concrete repair, and collateral and auxiliary work as needed to complete the project

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents