Similar Projects
Upgrade or Ventilation Fy22 NRM
Alteration
Design
$1,000,000 to $5,000,000 est. value
Loma Linda, CA 92354

HVAC Installation and Energy Infrastructure
Alteration
Bidding
Union City, CA

Henry Robinson Multi-Purpose Center HVAC Replacement
Alteration
Bidding
$650,000 est. value
Oakland, CA 94612

Nokomis Elementary School Re-Roof and HVAC Upgrade
Alteration
Sub-Bidding
Ukiah, CA 95482

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

City Hall Building HVAC Upgrades
Results
Less than $125,000 est. value
Santa Clarita, CA 91355

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Bidding
$1,900,000 est. value
Oakland, CA

HVAC Replacement
Term Contract
Post-Bid
$24,000 to $29,000 est. value
Alameda, CA

Yuba County Courthouse Air Handler Unit Replacement Project
Alteration
Results
Marysville, CA 95901

Anaheim West Tower HVAC Rehabilitation and Related Work
Term Contract
Bidding
$6,000,000 est. value
Anaheim, CA 92805

EMS Upgrades at the Main Library
Alteration
Post-Bid
Burlingame, CA 94010

Alerton Variable Air Volume Controllers Replacement and Unscheduled Repair Services for Sacramento DMV Headquarters
Alteration
Results
$224,520 est. value
Sacramento, CA 95818

HVAC A-E and Construction Management Services
Renovation, Term Contract
Bidding
Less than $65,000,000 est. value
Livermore, CA 94550

Last Updated 12/17/2021 12:23 PM
Project Title

HVAC Upgrades Project

Physical Address View project details and contacts
City, State (County) Fairfield, CA 94534   (Solano County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $198,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The HVAC Upgrades Project includes, but is not limited to, the replacement of heating, ventilation, air conditioning equipment with new equipment and/or redundant equipment including upgrading heating/cooling zones to variable air volume flow, providing building automation system, ductwork rerouting, new temperature control valves and actuators, new AHU economizer dampers and actuators, new air filters for the AHUs, new hot water boilers for the Administration and Operations buildings, new redundant hot and chilled water pumps, new redundant mini-split for the Maintenance Building, start/stop and status for all exhaust fans, and integration of controls of all components to a new building automated system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents