Similar Projects
Bog Road Halloween Storm Repairs
Infrastructure
Bidding
Belvidere, VT

Newton Valley Road Halloween Storm Repairs
Infrastructure
Bidding
Belvidere, VT

Newbury Elementary School Drainage/ Grading Work and Concrete Wall Replacement
Post-Bid
Newbury, VT 05051

Shady Rill Recreation Area Streambank Restoration - Phase 3 Implementation
Post-Bid
Middlesex, VT

River Bank Retaining Wall Replacement
Results
$1,600,000 est. value
Springfield, VT

Rush Meadow Road Culvert Replacement
Results
West Windsor, VT

Belvidere Smithville Road and Basin Road Halloween Storm Repairs
Infrastructure
Bidding
Belvidere, VT

2020 Grants in Aid Project
Post-Bid
Norwich, VT 05055

VT FLAP Brandon BR22(1)
Results
$100,000 to $250,000 est. value
Brandon, VT

Fisher Road Culvert Replacement
Infrastructure
Bidding
Berlin, VT 05602

Garvin Hill Road and Grout Road Project
Infrastructure
Post-Bid
$25,000 est. value
Hartland, VT

Rogers Road Culvert Replacement
Results
Westford, VT 05494

Gooseneck Bend Road Slope Stabilization
Infrastructure
Bidding
Weybridge, VT 05753

Culvert Project
Infrastructure
Post-Bid
Winhall, VT 05340

2020 Maple Hill Road Culvert Replacement
Results
Barton, VT 05822

Last Updated 07/01/2021 09:24 AM
Project Title

Rochester Town Office Retaining Wall Improvement Project

Physical Address View project details and contacts
City, State (County) Rochester, VT 05767   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of ±60 feet of existing cast-in-place concrete retaining wall adjacent to stream. Proposed replacement wall will be constructed of precast concrete blocks as shown on the attached plans. Construction of replacement retaining wall will be in very close proximity to stream channel and existing municipal sewer line/manhole infrastructure.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents