Similar Projects
Station 82 Bathroom Remodel - City of Longview
Renovation
Conception
$400,000 CJ est. value
Longview, WA 98632

Construction of Facilities - City of Mount Vernon
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Mount Vernon, WA 98273

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

Douglas County Fire District No.2 - Repair Water Damaged Manufactured Home
Renovation
Design
$200,000 CJ est. value
East Wenatchee, WA 98802

Station 63 Pre-Engineered Metal Building
New Construction, Infrastructure
Bidding
$1,200,000 CJ est. value
Vancouver, WA 98685

Clark-Cowlitz Fire Rescue Station 26 Repairs
Renovation, Infrastructure - 17,340 SF
Bidding
$550,000 CJ est. value
Battle Ground, WA 98604

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Redmond Fire Station 16 and Maintenance Facility Seismic Upgrades
Renovation
Post-Bid
$2,000,000 to $3,000,000 est. value
Redmond, WA 98052

Construction of Police and Municipal Court Building
Renovation
Results
Bainbridge Island, WA 98110

Mclane Black Lake Fire Department Station 95 Renovations
Renovation
Results
Olympia, WA 98512

Construction of Douglas County Fire District 4 Station 244 - Re-bid
New Construction, Infrastructure
Construction
$1,797,000 CJ est. value
Orondo, WA 98843

Lacey Fire District 3 Vehicle Repair Facility Expansion
Addition, Demolition, Infrastructure
Construction
$2,784,000 CJ est. value
Olympia, WA 98513

Vancouver Public Safety Center / Police Headquarters Remodel
Demolition, Build-out, Renovation
Pending Verification
$5,000,000 CJ est. value
Vancouver, WA 98684

Police Headquarters - Energy Efficiency Improvements - $FAC-00010 - City of Tacoma
Renovation
Conception
$2,500,000 CJ est. value
Tacoma, WA 98409

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

Last Updated 07/22/2023 04:04 AM
Project Title

Mount Vernon Fire Station No 2

Physical Address View project details and contacts
City, State (County) Mount Vernon, WA 98273   (Skagit County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $5,022,603 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Submission Deadline July 7, 2023, 11:00am SCOPE Addition and Renovation of Fire Station #2. A. Remove portions of the existing building as indicated in plans. B. Remove and/or relocate generator as indicated in plans. C. Remove paving and curbs as required to accomplish new work. D. Remove storm pipe where indicated in civil plans. E. Remove exterior fixtures where indicated in civil plans.

Details

9,323 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents