Similar Projects
201st Taxiway and Ramp Repair
Design
$250,000 to $500,000 est. value
MD

NAVFAC Washington, P3002 Par Relocate Hazardous Cargo Pad and EOD Proficiency Range
Design
Andrews Air Force Base, MD 20762

Runway Rubber Removal Services
Term Contract
Bidding
$100,000 to $500,000 est. value
Middle River, MD 21220

Runway Rubber Removal Services
Term Contract
Bidding
$100,000 to $500,000 est. value
Middle River, MD 21220

Taxiway W-6 Constructability Review, Joint Base Andrews
Post-Bid
Andrews Air Force Base, MD

Taxiway B Pavement Maintenance project for Talbot County at Easton/Newnam Field Airport
Post-Bid
Easton, MD 21601

Extend R/W 11-29: Phase II - Site Preparation
Results
$4,000,000 to $5,000,000 est. value
MD

Taxiway Whiskey Repair Joint Base Andrews
Results
Andrews Air Force Base, MD 20762

Apron Throat Reconstruction
Bidding
Less than $120,000 est. value
Havre de Grace, MD

Runway Traction Sand
Post-Bid
Glen Burnie, MD 21061

RUNWAY 9-27 REHABILITATION
Results
Hagerstown, MD

Reconstruct Runway 14-32 and Improve RSA Ocean City Municipal Airport
Bidding
Ocean City, MD

Replace and Upgrade Taxiway Whiskey Phase IV
Post-Bid
Andrews Air Force Base, MD

Relocate Parallel Taxiway - Phase 1
Results
Frederick, MD 21701

Airline Maintenance Facility Site Development and Taxiway F Phase 1 - Segment 1
Bidding
$50,000,001 to $75,000,000 est. value
Baltimore, MD 21240

Last Updated 04/10/2020 09:26 AM
Project Title

Garrett County Airport West Apron Construction Project

Physical Address View project details and contacts
City, State (County) Accident, MD 21520   (Garrett County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will entail the construction of approximately 10,100 square yards of asphalt aircraft parking apron on the northwest side of the airfield. As part of this project, temporary erosion and sediment controls will be installed to mitigate the temporary runoff created by over 250,000 cubic yards of excavation to prepare the subgrade for the proposed pavement section. Also included will be the construction of an open and closed drainage system conveying site runoff to a new Stormwater Management Pond required to mitigate runoff from the site for all future impervious development and the construction of the proposed pavement section; which will consist of a course aggregate base and asphalt surface course. The finished pavement surface will be striped with surface painted markings to allow for the safe maneuvering of aircraft in this area. New apron edge lighting will be installed adjacent to the proposed apron and power will be provided to a new L-807 Primary Wind Cone to be installed on the south side of the existing Runway. The excess excavation material from this project is to remain on airport property and placed and compacted on the south side of the Runway.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents