Similar Projects
Low Slope Roof Replacement Project at Pioneer Heritage Middle School and Wester Middle School
Post-Bid
Frisco, TX 75034

Roofing Replacement/Technical Repairs Project
Post-Bid
Frisco, TX 75034

Schimelpfenig Library Roof Replacement
Results
$480,000 est. value
Plano, TX 75023

Reroof Collin County 920 East Park Boulevard
Results
$273,500 est. value
Plano, TX 75074

Roofing Envelope Services
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing IDIQ- Plains Area - South
Post-Bid
$2,000 to $3,000,000 est. value

Interurban Railway Museum Roofing and Minor Brick Replacement
Results
$60,000 est. value
Plano, TX 75074

5900 West Plano Parkway Reroofing
Post-Bid
$1,000,000 to $2,000,000 est. value
Plano, TX

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

BPO for Roof Repairs NWROF
Post-Bid
Dallas, TX

Pavilion Roof Replacement
Results
Allen, TX 75002

Roofing Repair and Maintenance
Post-Bid

Roof Replacement Package #2 – Murphy Distribution Center
Results
$616,000 est. value
Murphy, TX 75095

Roofing Repair and Maintenance
Post-Bid

Reported 01/15/2021 12:00 AM
Project Title

Roofing Replacement/Technical Repairs Project

Physical Address View project details and contacts
City, State (County) Frisco, McKinney, TX 75035   (Collin County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Low Slope Roof Replacement, Membrane Peel and Roof Coating including the replacement of damaged metal coping cap, flashings, vent stacks, exhaust fan covers, appurtenances, etc. and cannot be completed during the school year. Bid Package 4: Heritage High School, Scott Elementary School, Sonntag Elementary School and Sem Elementary School. The estimated budget for BP-4 is approximately: $5,000,000.00. Bid Package 5: Independence High School, Liscano Elementary School, Norris Elementary School and Tadlock Elementary School. The estimated budget for BP-5 is approximately: $5,000,000.00. Bid Package 6: Nelson Middle School, Roach Middle School and Vandeventer Middle School. The estimated budget for BP-6 is approximately: $5,000,000.00.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents