Similar Projects
Krug Park Playground - 260630 - City Of Saint Joseph
New Construction
Conception
$250,000 est. value
Saint Joseph, MO 64505

Krug Park Castle Restrooms - 250676 - City Of Saint Joseph
New Construction
Conception
$300,000 est. value
Saint Joseph, MO 64501

Asphalt Repair and Replacement at Five District Sites
Infrastructure
Bidding
$500,000 CJ est. value
Saint Joseph, MO 64501

Cross Country Track Dirt Work
Infrastructure
Post-Bid
Saint Joseph, MO 64507

476-L Andrew County Levee Rehab
Infrastructure
Post-Bid
$500,000 CJ est. value
Saint Joseph, MO 64503

Spring Sports Complex, Backstop Netting Replacement to Eder Hall
Renovation
Results
Saint Joseph, MO

2022 Bessie Ellison and Hyde Elementary Schools
New Construction
Results
Saint Joseph, MO 64507

Hyde Park Cable-Stay Bridge - 2020 General Obligation Bond - City of St. Joseph
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Saint Joseph, MO 64501

Rosecrans Memorial Airport Air Traffic Control Tower - City of St. Joseph
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
Washington Township, MO 64503

Krug Park Stone Walls - 260640 - City of Saint Joseph
Renovation
Conception
$1,500,000 est. value
Saint Joseph, MO 64505

Runway 17-35 Reconstruction, Relocate Vehicle Service Outside Object Free Area, Rehabilitate Taxiway D, Install New FAA NAVAID Equipment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Saint Joseph, MO 64503

Back Road Expansion
Infrastructure
Results
$36,420 CJ est. value
Faucett, MO 64448

Rosecrans Memorial Airport Terminal Building
Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Washington Township, MO 64503

Hyde Park Playground - 260620 - City of Saint Joseph
Renovation
Conception
$250,000 est. value
Saint Joseph, MO 64504

Pre-Kindergarten Addition and Renovations for St. Joseph Christian School
Addition, Demolition, Renovation, Infrastructure - 5,900 SF
Post-Bid
$2,000,000 CJ est. value
Saint Joseph, MO 64506

Last Updated 04/13/2023 10:06 AM
Project Title

RFP D/B- New Playground Equipment At The Lake Early Learning Center

Physical Address View project details and contacts
City, State (County) Saint Joseph, MO 64504   (Buchanan County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect - 03/29/23
Owner View project details and contacts
Architect View project details and contacts
Description

The design and installation of new Playground Equipment at the Lake Early Learning Center. A bid bond executed by the bidder and an approved surety company in the amount of five percent (5%)

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents