Similar Projects
Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Cape Girardeau Readiness Control - Install Roof Mounted Solar Panel Array and LED Lighting, FMS Building
Renovation
Design
Cape Girardeau, MO 63701

Replace Emergency Generator, Infrastructure - St. Louis Forensic Treatment Center (South)
Renovation
Sub-Bidding
$272,500 CJ est. value
Saint Louis, MO 63139

Job Order Contracting Services - Electrical Repair and Replacement, All Campuses
Term Contract
Sub-Bidding
$600,000 CJ est. value
Springfield, MO 65806

Hubbell LED Troffers Lighting
Post-Bid
Saint Louis, MO

Henry County Electrical Improvements - Summer 2021
Post-Bid
Windsor, MO

Electrical Services
Term Contract
Results
Columbia, MO

High Voltage Electrical Services
Results
$100,000 est. value
Jefferson City, MO

Lighting Wire
Term Contract
Sub-Bidding
Saint Louis, MO 63103

Solar Panel Removal and Re-Installation
Alteration
Post-Bid
Hillsboro, MO

Kansas City District Modot Battery Back Up Ups Systems
Results
Lees Summit, MO

Street Lighting Wire
Term Contract
Sub-Bidding
Saint Louis, MO 63103

Preservation Square Phase 2B - Public Improvements Package
Alteration
Post-Bid
Saint Louis, MO 63106

Led Light Pole Fixtures
Results
Ballwin, MO

Sign Installation
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Grandview, MO 64030

Last Updated 09/12/2022 03:37 PM
Project Title

Peak Flow Pump Piping and Electrical Replacement 2022

Physical Address View project details and contacts
City, State (County) Aurora, MO 65605   (Lawrence County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $264,757 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract generally consists of replacing nine (9) valves on the peak flow pumps, replacing one (1) valve on the peak flow return line, replacement of electrical controls and lighting, and painting the piping and interior of the peak flow pump building at the Aurora, Missouri Wastewater Treatment Facility.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents