Similar Projects
Wastewater Treatment Plant Upgrade Phase 2 Project - General/Mechanical Construction
Infrastructure
Bidding
Less than $19,750,000 est. value
Clairton, PA

Upgrade Sludge Dewatering System at Duncansville Wastewater Treatment Plant - General Construction
Addition
Bidding
$700,000 est. value
Duncansville, PA 16635

Wastewater System Relocation
Post-Bid
New Paris, Seward, PA 15554

Wastewater System Relocation
Post-Bid
New Paris, Seward, PA 15554

Install Two Single Residence Sewage Treatment Plants
Results
Erie, PA

Wastewater Treatment Plant Upgrade General
Results
$22,500,000 est. value
Rochester, PA 15074

Construction of Wastewater Treatment Plant Headworks Improvements - General
New Construction
Construction
$1,500,000 est. value
Phoenixville, PA 19460

Berks County Wastewater Treatment Plant Upgrade Project
Construction
Leesport, PA 19533

WWTP and Conveyance System Upgrades - General/Mechanical Construction
Addition
Bidding
Less than $5,230,000 est. value
Pittsburgh, PA

Furnishing, Delivery and Set Up for One (1) New 5 Ton 45' 6" Span, Rail & Conductor Bars
Post-Bid
McElhattan, PA 781290

Phase III Wastewater Collection System Project
Results
PA

WWTP Phase II Improvements - General Construction
Construction
$5,000,000 to $5,500,000 est. value
West Chester, PA 19380

Rehabilitation of Sewage Treatment Plant
Renovation
Bidding
Prosperity, PA 15329

Smithville POTW UV Disinfection Improvements Project
Post-Bid
Wellsboro, PA

Wastewater Treatment Plant Upgrade - General Construction
Results
$5,840,000 est. value
Westfield, PA 16950

Last Updated 06/16/2021 02:40 PM
Project Title

Taylor Run Wastewater Treatment Plant Tertiary Filtration System Project - Civil/Mechanical Work

Physical Address View project details and contacts
City, State (County) West Chester, PA 19380   (Chester County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 to $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of two (2) contracts to construct a tertiary filtration system at Taylor Run WWTP. Contract No. TRWWTP 2021-1-C/M generally covers civil and mechanical work in items 1 thru 12. Contract No. TRWWTP 2021-1-E generally covers electrical work in item 13. 1. Site work, E&S Control measures, fencing, excavation and backfill. 2. Three (3) new disk filters in the existing Chemical Building (B-6), complete with sludge wasting valves, backwash/reject water pumps, connecting piping and valves, control panels, and other accessories as specified or indicated on the Drawings, and required for a complete, satisfactory system. 3. A precast concrete vault consists of Filter Feed Pumping Station, concrete baffle (compartment wall), and Filtered Effluent Chamber, complete with gooseneck, vents with insect screen, concrete/grout corner fillets, sumps, antiflotation collars (if needed), aluminum access hatches with drains, access ladders, boots/sleeves/linkseal for pipes, diffusers and other accessories. 4. Three (3) new variable speed submersible filter feed pumps and a control panel that houses three (3) VFDs, complete with discharge elbows, all lifting devices (hoists, crane, cables, hooks and sockets), guiderails, brackets, cables, level transmitters and level switches. 5. Yard piping, restrains, concrete thrust blocks; flanged piping, three (3) magnetic flow meters and supports. 6. Building modifications to remove chlorine ton cylinder supports and related equipment, enclose the loading dock with masonry walls, swing handrail for protection, insulated doors and windows. 7. Heating and ventilation equipment 8. Painting. 9. Signs, labels and markers. 10. Modify weir plates in existing chlorine contact tanks. 11. Bypass pumping with pump and flow control. 12. Restoration. 13. All associated electrical work to furnish and install conduits, wiring, connections, electrical components and lighting, interlocks in the existing motor control center (MCC); and install the conduits, wiring, connections and interconnections for Civil/Mechanical Contractor supplied control panels, field mounted instruments (autodialer, level transmitter, level switches and flowmeters, etc.), heaters and ventilator, etc.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents