Similar Projects
Gifford Building Parking Lot Expansion- Taunton State Hospital
Post-Bid
Taunton, MA

Construction of a New Gravel 2,430 Sq. Ft. Parking Lot
Post-Bid
Less than $25,000 est. value
Fall River, MA 02723

Resurfacing and Related Work on Sections of Route 44 (Winthrop Street)
Results
Less than $4,733,328 est. value
Dighton, Taunton, MA 02718

Resurfacing and Related Work (including 6 Bridge Decks and Ramps) along a Section of Route 24
Results
Less than $15,709,565 est. value
Bridgewater, Brockton, Raynham, West Bridgewater, MA 02301

On-Call Flooring Repair Services and Concrete/Asphalt Services
Term Contract
Post-Bid
Less than $25,000 est. value
Fall River, MA 02721

Sidewalk Reconstruction Along Thacher and Snell Streets, Oakhurst 667-1
Results
$40,000 est. value
Attleboro, MA 02703

Highway Phase II
Post-Bid
Dartmouth, MA

Year 2020 Town Roadway Paving Improvements
Term Contract
Results
Less than $800,000 est. value
Westport, MA

Annual Highway Phase I
Term Contract
Post-Bid
Dartmouth, MA

Green Street- Phase III Roadway Reconstruction Project
Results
Less than $700,000 est. value
Fairhaven, MA

Replacement of Asphalt Parking Lot at Chandler Avenue Development Located in Taunton
Infrastructure
Post-Bid
$30,000 est. value
Taunton, MA

Westlawn Courtyard Design Phase 2
Results
Less than $140,000 est. value
New Bedford, MA 02741

Re-Paving Work for Seekonk High School
Infrastructure
Post-Bid
Seekonk, MA

2020 Street Improvement Project
Results
Less than $750,000 est. value
Fall River, MA 02722

Type I Pavement Resurfacing
Term Contract
Post-Bid
Taunton, MA

Last Updated 02/08/2022 09:46 AM
Project Title

Pavement Replacement and Site Improvements

Physical Address View project details and contacts
City, State (County) Norton, MA 02766   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of milling, asphaltic crack filling, paving geotextile, asphalt overlay and asphalt sidewalk for Jacobs Way. Removal and replacement of driveways and sidewalks for 14 units, site furnishings and associated landscaping at Jacobs Way Development for the Norton Housing Authority.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents