Similar Projects
Tuckers Branch Slide
Infrastructure
Bidding
WV

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Bidding
Lewisburg, WV

Mountain Valley Elementary School Renovations
Renovation
Post-Bid
Bluefield, Princeton, WV 24701

Improve Airport Drainage, Phase 1
Post-Bid
Huntington, WV

Dallas Pike Road Slip Repair +5
Results
WV

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Summersville Battle Run Waterline
Infrastructure
Bidding
$100,000 to $250,000 est. value
Summersville, WV 26651

Buffalo Creek and Gauley Flood Repairs
Post-Bid
Clay, WV 25043

US 250 at MP 17.24
Results
WV

Lower Mud River Levee Protection Project
Term Contract
Post-Bid
$25,000,000 to $100,000,000 est. value
Milton, WV 25541

Walnut Hill
Results
WV

Williamson (Hight) Drainage and Portals
Infrastructure
Post-Bid
Charleston, WV

Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Results
$500,000 to $1,000,000 est. value
Wheeling, WV 26003

Drain Replacement in the Student Center Ram's Den
Infrastructure
Post-Bid
Shepherdstown, WV

Jewell Hill
Results
WV

Last Updated 09/02/2021 08:54 AM
Project Title

Maidsville Lee Mine Drainage

Physical Address View project details and contacts
City, State (County) State-Wide: WV
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents