Similar Projects
Alameda County Fire Department Training Center - #20142 - Alameda County
New Construction, Infrastructure
Conception
$30,056,880 CJ est. value
Dublin, CA 94568

Castlewood Drive Bridge Replacement - Alameda County
Demolition, New Construction, Infrastructure
Conception
$5,955,000 CJ est. value
Oakland, CA 94605

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Post-Bid
$75,000,000 CJ est. value
Hayward, CA 94544

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

DVA Site Work and Geotechnical Mitigation for Alameda Columbarium and Outpatient Clinic and Conservation Management Office
Alteration
Results
$25,000,000 to $100,000,000 est. value
Alameda, CA

Sanitary Sewer Rehabilitation (Sub-Basin 83-403)
Infrastructure
Results
$5,436,460 CJ est. value
Oakland, CA 94612

West Grand and Brush Street Apartments
New Construction, Infrastructure
Construction
$22,364,000 CJ est. value
Oakland, CA 94612

Adeline Street Apartments
Demolition, New Construction, Infrastructure - 33,530 SF
Pending Verification
$11,000,000 CJ est. value
Oakland, CA 94607

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Underground Tank Removal and Replacement - PWZWCB2301 - City of Berkeley
Alteration
Conception
$400,000 est. value
Berkeley, CA

1919 Webster Street Commercial Building
Demolition, New Construction, Infrastructure - 520,335 SF
Design
$20,000,000 CJ est. value
Oakland, CA 94612

Joint Temporary Recycled Water Fill Station Project
Alteration
Post-Bid
$970,000 est. value
Dublin, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Last Updated 06/23/2023 10:49 AM
Project Title

Amador Tank Phase 2 Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Crescent City, CA 95531   (Del Norte County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $802,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 22, 2023, this project has not yet been awarded. A timeline for award has not yet been establish.** Questions pertaining to the project must be submitted by 5:00 pm Wednesday, May 3rd 2023. RFI's should be submitted to Andrew Leighton at aleighton@crescentcity.org and Krista Harper at Krista@harpereng.com. Contract before City Council May 15, 2023 The work includes the furnishing of the labor, materials, and equipment for rafter rehabilitation & bracing, manholes with associated platforms and ladders, recoating interior surfaces as required, disinfection; and exterior painting as required per the drawings and specifications. The project is located at 204 Amador Street, Crescent City, CA. Bidders must correctly prepare and submit the documents listed in Section 00 40 00, Bid. Each bid must be accompanied by a bid guaranty bond, or a certified or cashier's check payable to the order of the Owner in an amount not less than ten percent (10%) of the amount of the bid as a guaranty that the bidder will execute the contract if it is awarded in conformity with the bid form. The successful bidder will be required to furnish performance and payment bonds, each in an amount not less than one hundred percent (100%) of the contract price. At the successful Bidder's option, securities may be substituted for the required retention, in accordance with the provisions of Section 22300 of the State of California Public Contract Code. The Owner reserves the right to reject any or all bids and to determine which bid is, in the Owner's judgment, the lowest responsive bid of a bidder or group of bidders. The Owner also reserves the right to waive any informalities in any bid and to delete items listed in the bid. Bids received after the time established for receiving bids will not be considered. Except as provided in paragraph 00 20 10-1.04(A), no bidder may withdraw his bid after the time established for receiving bids or before the award and execution of the contract, unless the award is delayed for a period exceeding ninety (90) calendar days. This is a public works project subject to the rate of prevailing wages as established by the California Department of Industrial Relations and the U.S. Department of Labor. Bidders are notified that the higher of either the Davis-Bacon or the State prevailing wage rate shall apply. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations and the U.S. Department of Labor. Bidders are hereby notified that pursuant to Section 1773 et seq. of the Labor Code of the Statutes of the State of California, the Owner has obtained from the Director of the Department of Industrial Relations the general prevailing rate of wages and employer payments for health and welfare, vacation, pension, and similar purposes for work to be done within Del Norte County, California. Regulations regarding the application of these wage rates are given in paragraph 00 20 00-1.12. Owner has also provided Davis-Bacon wage rates from the U.S. Department of Labor. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Bidders on this work must comply with all applicable governmental and local agency requirements. Requests for interpretation must be directed in writing to Krista Harper, Harper & Associates Engineering, Inc., at Krista@Harpereng.com [(951) 372-9196]

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents