Similar Projects
New Neighborhood School at Monument Ranch
New Construction
Conception
Perris, CA 92570

Pine Ridge Elementary School Class Room Renovation
Renovation, Addition
Conception
$5,400,000 est. value
Magalia, CA 95954

Mission Bay Elementary School
New Construction
Design
San Francisco, CA 94158

Delevan Drive Elementary School
Addition
Design
Los Angeles, CA 90065

Mckinley Elementary School Corner Improvements
Renovation
Bidding
Burlingame, CA 94010

Ambuehl Elementary School Modernization
Renovation
Bidding
$2,500,000 est. value
San Juan Capistrano, CA 92675

Albert Einstein Academies Charter Elementary School Phase 1 Whole Site Modernization (Lease-Leaseback)
Renovation
Sub-Bidding
$18,000,000 to $18,250,000 est. value
San Diego, CA

Preconstruction and Lease-Leaseback Construction Services
Renovation
Post-Bid
$2,640,000 est. value
Gustine, CA 95322

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Shade Structure Installation
Renovation
Results
Mill Valley, CA 94941

Architects for Plans to Modify Administrative Building of ABLE Charter Schools
Renovation
Results
Stockton, CA 95207

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Cleveland Elementary School New Classroom Building & Interim Housing
New Construction, Demolition - 5,581 SF
Construction
$7,200,000 est. value
San Francisco, CA 94158

Pine Ridge Elementary School New Administration Building
New Construction
Conception
$3,300,000 est. value
Magalia, CA 95954

New Flex Space Facility
New Construction
Design
Ben Lomond, CA 95005

Last Updated 05/09/2022 03:46 AM
Project Title

Cameron School Critical Needs Project

Physical Address View project details and contacts
City, State (County) El Cerrito, CA 94530   (Contra Costa County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes removal of existing boilers and related piping, installation of new heat recovery condensing curb mounted units. Path of travel improvements including hallway flooring, door hardware replacement and paving. Scope also includes drinking fountain, one unisex restroom, and sink cabinets. New 3 phase enclosure and new MSB-Main Switchboard.

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents