Similar Projects
Town Hall HVAC Replacement
Alteration
Bidding
Miami Lakes, FL 33014

MIA Fire Alarm Replacement
Post-Bid
Miami, FL

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

MIA - Terminal H FL2 Area A - Smoke Evacuation System
Results
$832,796 est. value
Miami, FL

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

Install Fire Sprinkler System and Upgrades in B-708 Homestead, FL
Renovation - 11,300 SF
Results
$5,000,000 to $10,000,000 est. value
Homestead, FL 33039

HVAC and Mechanical Products
Term Contract
Post-Bid

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Homestead, ARB, FL HVAC IDIQ Sources Sought
Post-Bid
Homestead, FL

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

Chillers and Water Treatment Services
Post-Bid
FL

Maintenance, Monitoring, Testing and Inspections of Fire Alarm, Access and Security Systems
Term Contract
Results
Less than $450,000 est. value
Alachua, Daytona Beach, Fort Lauderdale, Fort Myers, Fort Pierce, Jacksonville, Lakeland, Largo, Marathon, Miami, Opa-locka, Orlando, Pensacola, Saint Petersburg, Tallahassee, Tampa, West Palm Beach, FL

Reported 12/15/2021 12:00 AM
Project Title

Miscellaneous Construction Contract (Mcc)

Physical Address View project details and contacts
City, State (County) Miami, FL 33136   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Fire Protection, HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $47,568
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of major components/WAP required mechanical ventilation measures such as energy recovery ventilators (ERV), bathroom exhaust fans and kitchen exhaust fans in addition to the Central HVAC components: air filter replacement, ductwork, smart thermostat, tune-up or existing inefficient central A/C replacement.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents