Similar Projects
UTMB - Emergency Room Building AHU Replacement
Post-Bid
Galveston, TX 77550

Comprehensive HVAC Solutions and Services - Part 1
Post-Bid
Pittsburg, TX 75686

Exhaust Ventilation System
Results
$25,000 to $100,000 est. value
El Paso, TX 79916

Annual Contract - Cooling Towers Cleaning Services
Term Contract
Results
San Antonio, TX

Texas A&M Dunn HVAC Replacement
Construction
College Station, TX 77840

Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

Austin, TX ATCT DCD/HVAC Replacement
Results
$1,000,000 to $5,000,000 est. value
Austin, TX 78719

Split System Air Conditioning Units
Post-Bid
Huntsville, TX

Dedicated Outside Air Units
Results
$320,420 est. value
Mesquite, TX

Chiller Inspections and Repairs for Rusk State Hospital
Post-Bid
Rusk, TX 75785

Steam Units 2 and 3 Boiler Repair
Results
$549,000 est. value
Greenville, TX 75401

Multiple Campus RTU Replacements
Post-Bid
Mount Pleasant, TX 75455

Replace Two Chiller Circuites for a Building
Results
$250,000 to $500,000 est. value
Killeen, TX 76544

Red River Army Depot (RRAD) Utility Energy Services Contract
Post-Bid
New Boston, TX 75570

HVAC Refurbishing Fire Admin Building
Results
Irving, TX

Last Updated 02/19/2020 04:26 PM
Project Title

Sorority Row HVAC Change Outs

Physical Address View project details and contacts
City, State (County) Denton, TX 76205   (Denton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor to perform and provide Heat Load Calcs to verify tonnages 2. Contractor to verify all tonnages of existing systems 3. Contractor to remove old equipment and dispose of by code 4. Highest Priority will be the comfort of the individual sleeping quarters of the houses 5. New equipment is to be 14 SEER or higher and labeled matching AH and Condensers 6. Straight Electric Heat 7. Heat Pump to be offered as an upgrade a.All new Systems should be quoted as ALL Straight Cool OR Heat Pump b.House D Chapter Room, House G House Mom/Lobby/Bedrooms, and House F Front Bedrooms all (3) have been replaced within the last year and will not require a new unit install but will require all other items included in the scope of work where applicable. Amount could change if additional unit failures occur before project begins. 8. New Programmable Tstats 9. New Tstat wiring ran for each unit 10. Set Max Heat to 78* 11. Set Max Cool to 65* a. Houses F & G will need sensors with avg temperature control for downstairs bedrooms ONLY 12. New P-Traps and drain line as much as possible and identify/locate main drain line tie-ins within bed/bath rooms 13 PVC drain line should be ran as such: (Male adapter -- Union -- Ball valve -- Vent -- P-trap -- Vent -- Ball valve 14. Nitrogen flush remaining drain line 15. New drain line float switches and Drain pan float switches

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents