Similar Projects
Construction of the Chip Seal Program Fiscal Year 2020/2021 and 2021/2022 Project
Bidding
Prescott Valley, AZ

SR 69 Frontage Road Pavement Overlay Project
Bidding
$390,000 est. value
Prescott Valley, AZ

Pavement Preservation
Post-Bid
Cottonwood, AZ 86236

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Page Springs Road Seal Coat
Results
Less than $195,000 est. value
Prescott, AZ

Y--Badger Springs Recreation Site Roads
Results
$150,000 to $250,000 est. value
Black Canyon City, AZ 85324

Road 2 North Paving Improvements Project
Bidding
$800,000 est. value
Chino Valley, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

TOPV IGA Roadway Improvement Projects
Results
Prescott, Prescott Valley, AZ 86314

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

System Enhancement-Other Enhancements
Results

Chip Seal Summer FY 2020-2021
Post-Bid
$1,012,400 est. value
Prescott, AZ

Viewpoint Drive Connector
Results
Prescott Valley, AZ 86314

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Verde Valley School Road Overlay
Results
$562,200 est. value
Prescott, AZ 96305

Last Updated 03/13/2020 02:28 PM
Project Title

2019-2020 Overlay

Physical Address View project details and contacts
City, State (County) Prescott, AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $957,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes furnishing of all labor, materials, equipment, fixtures and services required for the asphaltic concrete overlay on Burnt Ranch Road, Shadow Valley Drive, Old Kettle Trail, Woodside Drive, Clubhouse Drive, Butterfield Road, and Old Chisholm Trail in the Prescott area. The total project length is 16,013 feet with approximately 4,341 tons of fiber reinforced asphaltic concrete with PG 64-22 binder and 1,134 tons of conventional asphaltic concrete with PG 64-22 binder. Other associated work includes re-established pavement markings throughout the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents