Similar Projects
Safety Improvements Tolland Turnpike at Buckland Street and Adams Street
Infrastructure
Bidding
Manchester, CT

Crack Sealing and Color Coating Hard Surface Courts
Infrastructure
Bidding
Manchester, CT

Tromley Road Reconstruction
Post-Bid
Windsor, CT

Contractor Rate Submittal to Public Works for 2021-2023
Term Contract
Post-Bid
Suffield, CT

Village Road Safety Improvement Project
Results
Canton, CT

Highland Street Pavement Rehabilitation - Rocky Hill Town Line to Thornbush Road
Results
Less than $869,127 est. value
Wethersfield, CT

2022 Permanent Pavement Repair Program
Term Contract
Bidding
Manchester, CT

Trench Restoration 2021
Post-Bid
Southington, CT

I-84 - TR 825 Over US 44 E/B and Columbus Boulevard
Results
$5,000,000 to $7,499,999 est. value
Hartford, CT 06101

Utility Pavement Restoration
Infrastructure
Post-Bid
Plainville, CT

Indefinite Quantity Construction Services for Road & Bridge Maintenance
Results
$1,000,000 est. value

Road Reconstruction Project - Harvey Lane
Infrastructure
Post-Bid
Suffield, CT 06078

Resurfacing, Bridge and Safety Improvements on Route 2
Results
$40,000,000 to $59,999,999 est. value
East Hartford, Glastonbury, Hartford, Wethersfield, CT

Drainage Improvements - 2021 Mill and Pave Project
Infrastructure
Post-Bid
Suffield, CT

2021 Reclamation
Results
West Hartford, CT

Reported 03/17/2022 12:00 AM
Project Title

Reconstruction Of Brewer Street

Physical Address View project details and contacts
City, State (County) East Hartford, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,900,000 to $6,900,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This bid includes reconstruction of approximately 3,230 feet of Brewer Street from Main Street (Route 517) to a point approximately 150 feet east of Jefferson Lane in the Town of East Hartford. The work includes a full-depth roadway reconstruction, replacement of the existing bridge at Pewterpot Brook, a new traffic signal at Brewer Street and Glenn Road, new roadway drainage systems, new granite curbing, new concrete sidewalks primarily on the south side of the roadway, signing and pavement markings, maintenance and protection of traffic, and appurtenant work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents