Similar Projects
Joint Base Myer-Henderson Hall: Army Family Housing Renovation Project, Fort McNair, Washington, D.C
Renovation - 41,910 SF
Results
$10,000,000 to $25,000,000 est. value
Washington, DC 20001

Z--NACE 242190 - Carter G. Woodson Home (Phase II)
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Washington, DC 20001

Joint Base Myer-Henderson Hall: Army Family Housing Renovation, Fort McNair, District of Columbia
Renovation
Bidding
$10,000,000 to $25,000,000 est. value
Washington, DC

E15 Kitchen Renovation and House Upgrades
Renovation
Bidding
Washington, DC 20020

Construction Services for the Emery Shelter Renovation
Renovation
Results
Washington, DC 20002

Reported 08/27/2021 12:00 AM
Project Title

Engine House 4 Kitchen Renovation and House Upgrades

Physical Address View project details and contacts
City, State (County) Washington, DC 20001   (District of Columbia County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes Kitchen Renovation and General Upgrades of the Engine House including, but not limited to the following: (a) Salvage and re-use/re-mount any existing ceiling speakers. (b) Upgrade Electrical System and Distribution Equipment. Electrical installation to match current code requirements and subject to change based on field inspection. (c) Perform upgrade to HVAC Distribution System. HVAC installation to match current code requirements and subject to change based on field inspection. 1. Contractor is responsible for a 1-to-1 register replacement and making sure all diffusers and registers are connected to ducts in final installations. 2. Contractor to perform testing, balancing and commissioning of HVAC system. (d) Upgrade Plumbing System installation to match current code requirements and subject to change based on field inspection. (e) At project closeout, contractor will be responsible for the final HVAC Cleaning per industry standards. (f) Demo and dispose of all existing light fixtures where specified in the SOW. Furnish & Install new 2' x 4' recessed LED light fixtures, the GC is responsible for a 1-to-1 light fixture replacement. (g) Salvage for re-use/re-mount all wall hung items (i.e., artwork, pictures, white boards, etc.) prior to painting walls. (h) Furnish & Install paint on all walls, trim, and hard ceilings, as per paint schedule. (i) Furnish & Install metal finish paint to INTERIOR doors & frame, as per Door Schedule. (j) All kitchen equipment to be onsite and ready for installation before kitchen demolition occurs to minimize downtime. Salvage existing kitchen appliances for temporary kitchen set-up in location determined by DGS Project Manager. (k) Create wall barrier with plastic sheeting protection to seal-off construction areas from engine house operations. (l) Cover and seal-off existing apparatus bay doors and associated operating controls to protect during construction activity in this area.

Details

Single-Family Homes, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents