Similar Projects
Reported | 09/16/2021 04:28 PM |
Project Title | Wiley Magnet Middle School Interior Upfit and Gymnasium Addition |
Physical Address | View project details and contacts |
City, State (County) | Winston-Salem, NC 27104 (Forsyth County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | |
Project Status | Construction Commenced first quarter 2020, Construction Nearing Completion |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Demolition of the existing school gymnasium and building a new gymnasium; including two levels: the 1st level (16,125SF) will have an entrance foyer, administration office area, restrooms and gymnasium. The basement level (8,100SF), which is partially above grade, will have four (4) classrooms, locker rooms and restrooms. Approx. 3,000SF of interior renovation of four (4) areas in the existing school building. The existing school gymnasium currently houses boilers that serve the main school building. These will be demolished with the gymnasium structure and two (2) new 3,000 MBH boilers will be installed in a built out mechanical room in the existing school building. Bid Packages (BP) Including Budget Estimates: (BE): BP099 Final Cleaning BE: $15,000.00 BP235 Structure Demolition/selective Interior Demolition/asbestos Abatement BE: $120,000.00 BP250 Deep Foundation System BE: $115,000.00 BP390 Cip Concrete (Turnkey) BE: $850,000.00 BP400 Masonry (Turnkey) BE: $900,000.00 BP500 Structural and Miscellaneous Metals (Turnkey) BE: $460,000.00 BP640 Millwork BE: $25,000.00 BP740 Roofing BE: $215,000.00 BP790 Joint Sealants, Waterproofing, Expansion Joints BE: $95,000.00 BP800 Doors, Frames, Hardware (Turnkey) BE: $100,000.00 Installation Included BP810 Fire Shutters (Turnkey) BE: $35,000.00 BP840 Glass and Glazing BE: $30,000.00 Interior Storefront Miscellaneous Interior Glazing BP850 Exterior Vinyl Windows BE: $85,000.00 BP920 Metal Studs, Drywall, Insulation, Acoustical Ceilings, Exterior Composite Columns BE: $250,000.00 BP960 Flooring and Hard Tile BE: $300,000.00 BP970 Wood/sports Flooring BE: $110,000.00 BP990 Interior and Exterior Painting and Coatings BE: $90,000.00 BP1014 Signage (Room Indentification Panel Signage) BE: $5,000.00 BP1020 Misc Accessories (Turnkey) BE: $30,000.00 Installation Included Plastic Toilet Compartments Toilet, Bath, And Laundry Accessories Fire Protection Cabinets Fire Extinguishers BP1040 Lockers (Turnkey) BE: $25,000.00 BP1312 Telescoping Bleachers (Turnkey) BE: $102,000.00 BP1350 Athletics (Turnkey) BE: $60,000.00 Telescoping Wall Mounted Basketball Systems Volleyball Sleeves Gymnasium Divider Curtain BP1420 Elevators BE: $70,000.00 BP1510 Plumbing Systems BE: $390,000.00 BP1520 Mechanical Systems BE: $1,500,000.00 BP1530 Fire Protection BE: $95,000.00 BP1600 Electrical Systems and Site Electrical Utilities BE: $800,000.00 BP3110 Site Work BE: $500,000.00. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |