Similar Projects
Construction Management/General Contractor for the River Park Center Suite 102
Renovation - 1,769 SF
Design
$1,000,000 est. value
Aspen, CO 81611

Howelsen Ice Arena Expansion
Addition - 4,200 SF
Bidding
Less than $1,250,000 est. value
Steamboat Springs, CO

Recreation Facility Replacement
New Construction
Bidding
Centennial, CO

Facility Refurbishment for Safety Risk Mitigation and Mod Ph4b 2015-031P14
Post-Bid
Less than $2,207,465 est. value
Denver, CO

Facility Refurbishment for Safety Risk Mitigation and Mod Phase 5 of 6 2015-031P14
Post-Bid
$1,071,492 to $1,385,483 est. value
Denver, CO

Concession Building Remodel
Results
$100,000 to $150,000 est. value
Westminster, CO 80031

Design Services for Pueblo Ice Arena Addition
Results
Less than $9,678 est. value
Pueblo, CO

Kitchen and Restroom Remodel
Renovation
Construction
Brighton, CO 80601

Carroll Butts Athletic Center Improvements
Renovation
Bidding
Westminster, CO 80031

National Western Center Stockyards & Event Center General Contractor Services Bid Package #2
New Construction
Post-Bid
Less than $15,000,000 est. value
Denver, CO

Hamlet Park Renovation
Results
$300,000 to $330,000 est. value
Centennial, CO

GCAA, FCIL, HCC Sound Studio
Build-Out
Post-Bid
Denver, CO 80203

SECM CHY MTN SP Camper Cabins PH1 C18CM1
Results
Colorado Springs, CO

Outdoor Recreation Equipment Concessionaire Public Private Patnership
Post-Bid
Grand Junction, CO 81501

Douglass-Eldorado Shade Shelters
Results
Boulder, Superior, CO 80303

Last Updated 05/22/2020 12:29 PM
Project Title

2020 Outdoor Arena Renovation & Upgrade

Physical Address View project details and contacts
City, State (County) Norwood, CO 81423   (San Miguel County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing footing and fencing, grade arena and install drainage, install new footing and fencing in the Outdoor Arena at the Fairgrounds; and as described in the scope of work below. A contractor may opt to bid the entire project – Arena Upgrade and Fence Construction - or a contractor may opt to bid one component –either the Arena Upgrade or the Fence Construction.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 03 - Concrete, Schedules for Concrete, Schedules for Cast-in-Place Concrete, Concrete Footing Schedule.
Division 33 - Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents