Similar Projects
Last Updated | 09/13/2022 03:36 AM |
Project Title | District 9 Pump Wash Bay Discharge System |
Physical Address | View project details and contacts |
City, State (County) | Oak Hill, WV 25901 (Fayette County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Technical Questions due at 10am ET 09/14/2022 PURPOSE AND SCOPE: The West Virginia Division of Highways is soliciting bids to establish an open-end contract for periodic pumping of the wash bay discharge systems including Sediment Trap, Oil Trap, and Oil/Water separator at nine (9) locations throughout District Nine (9). Periodic pumping service of the entire wash bay discharge system at nine (9) locations throughout District 9 Contract Award: The Contract is intended to provide Agencies with a purchase price on all Contract Items. The Contract shall be awarded to the Vendor that provides the Contract Items meeting the required specifications for the lowest overall total cost as shown on the Pricing Pages |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |