Similar Projects
Stadium Studio System
Renovation
Bidding
$30,000 CJ est. value
Charles Town, WV 25414

Roadway Salt - Sodium Chloride
Term Contract
Sub-Bidding
Charleston, WV 25301

Water Activated Flexible Patching Material
Term Contract
Sub-Bidding
Charleston, WV 25301

Design-Build /Design-Bid-Build, IDIQ MACC for General Construction Services in the Hampton Roads Area of Responsibility (AOR)
Term Contract
Post-Bid
$249,000,000 CJ est. value
Norfolk, VA 23510

Exterminating and Pest Control for 209 Public Housing Units, and 5 Maintenance Buildings
Alteration
Post-Bid
Beckley, WV

Pest Control for the Salem Correctional Center
Results
Industrial, WV 26426

Z1AZ--Capital Region Readiness Center (CRRC) Building Shell Services Recompete
Results
WV 25405

Steel Bollards
Term Contract
Sub-Bidding
Charleston, WV 25301

Exterminating and Pest Control for 31 Multifamily Units
Alteration
Post-Bid
Beckley, WV 25801

R.D. Bailey Lake Herbicide Service
Term Contract
Results
Simon, WV

Steel Rebar
Term Contract
Sub-Bidding
Princeton, WV 24740

Professional Engineering Services
New Construction, Infrastructure
Post-Bid
Huntington, WV

Portable Toilet Rental Services
Term Contract
Results
Clifftop, WV 25831

Channelizer Cones for All Roadways
Term Contract
Sub-Bidding
Charleston, WV 25301

Pest Management
Term Contract
Post-Bid
WV

Last Updated 09/13/2022 03:36 AM
Project Title

District 9 Pump Wash Bay Discharge System

Physical Address View project details and contacts
City, State (County) Oak Hill, WV 25901   (Fayette County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Technical Questions due at 10am ET 09/14/2022 PURPOSE AND SCOPE: The West Virginia Division of Highways is soliciting bids to establish an open-end contract for periodic pumping of the wash bay discharge systems including Sediment Trap, Oil Trap, and Oil/Water separator at nine (9) locations throughout District Nine (9). Periodic pumping service of the entire wash bay discharge system at nine (9) locations throughout District 9 Contract Award: The Contract is intended to provide Agencies with a purchase price on all Contract Items. The Contract shall be awarded to the Vendor that provides the Contract Items meeting the required specifications for the lowest overall total cost as shown on the Pricing Pages

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents