Similar Projects
Terminal Way Grade Separation - Los Angeles County Metropolitan Transportation Authority
Infrastructure
Conception
$999,000,000 est. value
Los Angeles, CA 90012

San Pedro Waterfront Access - Los Angeles County Metropolitan Transportation Authority
Infrastructure
Conception
$9,000,000 est. value
San Pedro, CA 90731

SR-47/Navy Way Interchange - Los Angeles County Metropolitan Transportation Authority
Infrastructure
Design
$99,000,000 est. value
Los Angeles, CA 90731

Improvement of Bike Network Connectivity/ATP Trails
Infrastructure
Design
$7,220,000 est. value
Corona, CA 92880

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 est. value
Ontario, CA 91761

South Apron Concrete Repair
Term Contract
Post-Bid
$1,000,000 to $3,000,000 est. value
CA 95903

Rubber Removal and 900 Ramp Restriping
Alteration
Post-Bid
Travis AFB, CA

Modesto Junior College East Campus Track Runways Relocation
Infrastructure
Results
$675,000 est. value
Modesto, CA 95350

PW Various Locations Pavement Renovation No 45 and Sewer Replacement
Infrastructure, Alteration
Results
$6,300,000 est. value
San Francisco, CA 94103

Alameda Corridor Terminus Enhancements - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 est. value
Compton, CA 90222

SJC New Taxiway Victor Phase 1
Infrastructure
Post-Bid
$22,000,000 est. value
San Jose, CA

Runway 20 Displaced Threshold at Santa Maria Public Airport
Demolition
Results
Santa Maria, CA 93455

North Hangar Ramp Seal Coat - City of Petaluma
Alteration
Conception
$450,000 est. value
Petaluma, CA 94954

Fire Retardant Pit and Taxiway Renovations
Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Redding, CA

Airport Way Resurfacing
Infrastructure
Results
$570,000 to $697,000 est. value
French Camp, CA

Reported 06/28/2022 04:03 PM
Project Title

Gillespie Field Rehabilitate Runway 17/35 - San Diego County

Physical Address View project details and contacts
City, State (County) El Cajon, CA 92020   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $5,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a transportation facility in El Cajon, California. Conceptual plans call for site work for a transportation facility. This project will rehabilitate Runway 17/35. This project was requested by Airport Program. The project is included in the San Diego County's FY 2020-2024 Capital Improvement Program (CIP). As of June 27, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents