Similar Projects
Fuel Farm Improvements - Phase III - General Bid
Bidding
$1,700,000 est. value
Nantucket, MA 02554

Fuel Farm Improvements - Phase III - Filed Sub-Bid
Bidding
Less than $1,700,000 est. value
Nantucket, MA 02554

Fuel Storage and Day Tank Systems Replacement - Gillis Pump Station, Hayes Pump Station and Lexington Street Pump Station - General Bids
Post-Bid
Less than $1,729,000 est. value
Stoneham, Wakefield, Waltham, MA

Replace Tanks, Furnace, and Hydro Heaters at Buffumville Lake, Charlton, MA
Post-Bid
Charlton, MA

Removal of 7500 Gallons Above Ground Tank
Results
Boston, MA

Install New Liner on Sodium Hypochlorite Tank
Results
Less than $24,000 est. value
Boston, MA

Removal and Disposal of Two 10,000-Gallon Heating Oil Tanks at Marsh Grammar School
Bidding
Methuen, MA 01844

Shrewsbury Pump Station Underground Storage Tank Removal Project
Post-Bid
Less than $30,000 est. value
Shrewsbury, MA 01545

Underground Storage Tank Removal and Installation of Three Above Ground Storage Tanks - General Bid
Results
Less than $195,000 est. value
Nantucket, MA 02554

Underground Storage Tank Upgrades at the Everett Department of Public Works
Post-Bid
Less than $133,000 est. value
Everett, MA 02149

Removal and Installation of Three Above Ground Storage Tanks - Filed Sub-Bids
Results
Less than $195,000 est. value
Nantucket, MA 02554

Materials for Gas Construction
Post-Bid
Less than $100,000 est. value
Westfield, MA 01085

WPCF Fuel Tank Installation
Results
Less than $15,000 est. value
Montague, MA 01351

Annual Aviation Fuel Farm Inspections and Maintenance Services
Post-Bid
Less than $130,000 est. value
Nantucket, MA

Important Fuel Reduction, Habitat Management and Access Road Improvements on 318 Acres
Results
Less than $250,000 est. value
Plymouth, MA

Last Updated 02/06/2020 08:43 AM
Project Title

Gas Construction Contractor Annual Contract

Physical Address View project details and contacts
City, State (County) Holyoke, MA 01040   (Hampden County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Gas Construction Contractor Annual Contract. Gas line installation work to include installation of approximately 5,800 feet of replacement mains, 200 service renewals & perform cathodic protection remediation during the 2020 construction season; the bulk of work to be performed will be installation of polyethylene (PE plastic) natural gas mains & plastic services in reconstruction projects.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents