Similar Projects
2019 Annual Labor Water Line Installation Contract
Term Contract
Post-Bid
McDonough, GA 30252

Pipe and Fittings
Term Contract
Post-Bid
Augusta, GA

Hunt Road Utility Extensions
Results
Valdosta, GA

Wyckoff/Mars Hill Road 42 Pipeline Replacement
Results
Less than $7,000,000 est. value
Marietta, GA

Highway 119 Water Main Replacement
Post-Bid
Springfield, GA 31219

Sharon Drive Waterline Replacement
Results
Powder Springs, GA

Watermain Replacement
Post-Bid
Cochran, GA 31014

Ranger Transmission Main
Results
Less than $700,000 est. value
Calhoun, GA

Small Domestice Brass Fittings and Gate Valves
Term Contract
Post-Bid
Decatur, GA

Underground Enclosures/Meter and Detection Check Boxes and Vaults for the Department of Watershed Management
Term Contract
Results
Atlanta, GA

HDPE Pipe Liners
Term Contract
Post-Bid
GA

South Main/Pine Ridge Reuse Extension
Results
Hinesville, GA 31310

Martin Street Water Main Replacement
Post-Bid
Jefferson, GA

Cass-White Road Water and Sewer Utility Relocations
Results
Bartow, GA

South Industrial Park Phase I
Post-Bid
Eatonton, GA

Reported 03/06/2019 12:00 AM
Project Title

North Lowndes and Spring Creek Water System Interconnection

Physical Address View project details and contacts
City, State (County) GA   (Lowndes County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed North Lowndes and Spring Creek Water System Interconnection as shown on the construction drawings. In general, construction consists of the installation of +/- 23,028 l.f. of 12" to 16" HDPE water main, valves, fittings, directional bores, jack and bores, fire hydrants, erosion control and all associated measures required for complete installation.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents