Similar Projects
Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Annual Maintenance and Service to HVAC and Plumbing systems at Various Flood Control/Navigational Facilities
Term Contract
Post-Bid
Less than $200,000 est. value
Boston, MA

Furnish and Install Mini Split AC Unit
Results
Boston, MA 02210

Heating System Closed Loop Treatment
Results
Boston, MA

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Construction: Hydronic Piping III at the O`Neill Federal Building in Boston
Results
$1,000,000 to $1,400,000 est. value
Boston, MA 02222

Computer Room A/C Replacement and Associated Work - General Bid
Post-Bid
Less than $200,000 est. value
Boston, MA

HVAC Maintenance and Service Repairs
Results
Less than $455,000 est. value
Boston, MA

HVAC Maintenance Contract
Term Contract
Post-Bid
Boston, MA

Detention Upgrades for the Falmouth District Court - Sub-Bids
Results
Less than $540,000 est. value
Boston, MA

HVAC Air Filters at Logan International Airport
Term Contract
Post-Bid
East Boston, MA 02128

Boiler Replacement and Associated Repairs at Donald McKay School and Josiah Quincy Elementary School - General Bid
Results
$2,873,158 est. value
Boston, MA

Goessmann Hall 2nd Floor Renovation Project - Filed Sub Bids
Post-Bid
Less than $11,200,000 est. value
Boston, MA 02108

Boiler Replacement and Associated Repairs at the Donald McKay Schooland Josiah Quincy Elementary School - Filed Sub-Bids
Results
$2,873,158 est. value
Boston, MA

Telecommunication Upgrades to Existing Communication Facilities - Filed Sub Bids
Post-Bid
Less than $1,600,000 est. value
Boston, MA 02120

Last Updated 11/06/2019 10:17 AM
Project Title

MIS Data Center Air Conditioning Units Replacement

Physical Address View project details and contacts
City, State (County) Boston, MA 02129   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required Work includes furnishing all labor, materials,equipment and incidentals necessary to remove and replace two computer room air conditioners and two rooftop air cooled condensers and to conduct start-up and testing of the two newly installed systems at the MIS Data Center located in Chelsea,MA

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents