Similar Projects
Homestead Phase Four
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

Blackstone Headquarters / Providence
New Construction, Infrastructure - 85,000 SF
Bidding
$22,000,000 CJ est. value
Providence, UT 84332

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Spring Water Metering Vault 2021
Infrastructure
Post-Bid
Providence, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

100 West Corridor Construction
Infrastructure
Results
Logan, UT

Quarter Circle Drive Canal Piping Project 2021
Alteration
Construction
Nibley, UT 84321

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

100 West Executive Suites
Demolition, New Construction, Infrastructure - 80,920 SF
Pending Verification
$24,400,000 CJ est. value
Logan, UT 84321

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

North Valley Landfill Drain Net Installation V2
Infrastructure
Results
$68,020 CJ est. value
Logan, UT 84321

Deep Canyon Trailhead - Cache County
Infrastructure
Pending Verification
$760,000 CJ est. value
Mendon, UT 84325

Cemetery Phase II
Infrastructure, Alteration
Post-Bid
River Heights, UT 84321

Last Updated 02/07/2023 04:09 PM
Project Title

Jones Pipeline Project

Physical Address View project details and contacts
City, State (County) North Logan, UT 84341   (Cache County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Jones Pipeline Project replaces existing transite pipe with new isolation valves and PVC pipe Northwest of Newton Town. New pipe will range in size from 15" to 4" diameter P.I.P. PVC pipe over 14,300 ft. Along the pipeline, approximately twenty-two connections, which include air vacs and valves, will be made to shareholders to supply water to fields and homes. Two pressure reducing valve (PRV) stations will be installed. Permits required for the completion of this project include but are not limited to the following: Storm Water Prevention Plan, a Newton Town Encroachment Permit, and UDOT encroachment permit. The installation of this project is to be completed late spring early summer. Existing pipeline is to be in service during construction of the project and will be abandoned in place at the completion of the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents