Similar Projects
Last Updated | 07/12/2023 05:17 PM |
Project Title | Kalwall Skylight Panel Replacement |
Physical Address | View project details and contacts |
City, State (County) | Andover, KS 67002 (Butler County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $283,618 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish and install Kalwall's 2 3/4 " thick translucent panel system for (1) Segmented Shed skylight at Andover Central High School. Installation to include curb cap and sill flashing, sealants, and stainless steel fasteners, utilizing the existing structure and painting all exposed aluminum. - Furnish and install Kalwall's 2 3/4 " thick translucent panel system for (1) Dome skylight at Andover Central High School. Installation to include battens, flashing, covers, sealants, and stainless steel fasteners, utilizing the existing structure and painting all exposed aluminum. - Furnish and install Kalwall's 2 3/4 " thick translucent panel system for (1) Pyramid skylight at Andover Central Middle School. Installation to include battens, flashing, covers, sealants, and stainless steel fasteners, utilizing the existing structure and painting all exposed aluminum. - Furnish and install Kalwall's 2 3/4 " thick translucent panel system for (1) Ridge Roof skylight at Andover Middle School. Installation to include battens, flashing, covers, sealants, and stainless steel fasteners, utilizing the existing structure and painting all exposed aluminum. - All panels shall be constructed with: - .070 super weathering white exterior face - .045 white exterior face or project appropriate alternate - .23 U factor - 12x24 Shoji grid pattern - Aluminum painted with Kalwall's standard CRF coating Andover USD 385 reserves the right to accept or reject any and all bids, waive any formalities and/or technicalities in the bids and award the bid to best serve the interests of USD 385. Site visits are required for bid submission and may be arranged by contacting: Richard Bell bellr@usd385.org Bid Results Andover Central High Segmented Shed SGH Concepts - $93998 Andover Central High Dome SGH Concepts - $72400 Andover Central Middle Pyramid SGH Concepts - $54429 Andover Middle Ridge SGH Concepts - $62791 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |