Similar Projects
Last Updated | 11/26/2019 01:11 PM |
Project Title | Supply and Return Line Repair at Eisenhower Park Pool |
Physical Address | View project details and contacts |
City, State (County) | West Hartford, CT 06107 (Hartford County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Scope ofWork will consist ofbut not limited to the following installation: - Saw cut pool deck and remove cast supply/return piping from pool filter room to pool and connect to existing schedule 80 pvc header. - Replace cast piping with schedule 80 PVC piping (approx.. 230 t of4 inch pipe). - Core drill 18 new supply pipes (2" Schedule 40 PVC) through sides ofpool with new return ittings. - Seal new return fittings to pool to ensure no leakage at pool wall. - Compact soil, pin to existing concrete, 4 inch mesh reinforcement wire, and float concrete level to existing concrete deck. - Concrete 4000 psi load mix. - Town will pay all fees associated with the building permit process. - Not included: testing and/or removal ofhazardous materials. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |