Similar Projects
Cornelius Mixed-Use Building
New Construction - 36,000 SF
Conception
Cornelius, NC 28031

Holland Road - Mixed Use Assembly
New Construction - 76,500 SF
Conception
Apex, NC 27502

Norwood
New Construction - 21,152 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Charlotte, NC 28227

Metropolitan Village
New Construction - 39,810 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27101

RFQ Construction Manager - Construction Manager at Risk Services for Truist Ballpark MLB (Major League Baseball) Upgrades
Addition, Demolition, Infrastructure, Renovation
Bidding
$3,700,000 CJ est. value
Winston Salem, NC 27101

RFP D/B - Metrolina Materials Recovery Facility (MRF) Retrofit
Renovation
Bidding
$500,000 CJ est. value
Charlotte, NC 28206

North Carolina School of Science and Mathematics Site Development
Post-Bid
Morganton, NC 28655

Wake Forest University Anthropology
Demolition - 6,500 SF
Post-Bid
Winston-Salem, NC 27109

Sandhills Community College - Kennedy Hall Renovation and Addition
Renovation, Addition - 75,000 SF
Results
Pinehurst, NC

UNCC - Fretwell Cafe
Renovation
Results
$500,000 to $750,000 est. value
Charlotte, NC 28262

Sharon Road Mixed Use
New Construction, Renovation - 178,500 SF
Construction
$10,000,000 CJ est. value
Charlotte, NC 28211

Livingstone College F. George Shipman Science Center
Addition - 14,106 SF
Construction
Salisbury, NC 28144

2252 Hendersonville Road Office Building
New Construction - 2,304 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Arden, NC 28704

Greenville Intergenerational Community
New Construction
Pending Verification
Greenville, NC 28585

New Advanced Technology Center - Piedmont Community College
New Construction
Conception
$28,000,000 est. value
Roxboro, NC

Last Updated 08/17/2022 11:01 AM
Project Title

Edgecombe Community College Cosmetic Arts Office Renovation

Physical Address View project details and contacts
City, State (County) Tarboro, NC 27886   (Edgecombe County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Office
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 17, 2022, no bids received. No definite date for the rebid. Summary of Work o Convert 10'x10' Vichy Shower into an office space in the Cosmetology Building. o Remove ceramic tile on floor and walls and replace with gypsum board to be painted. o Remove exhaust fan and cap duct above ceiling. o Remove floor drains. Cap drain below floor and repair and infill concrete. o Install new window in wall facing esthetics lab. o Level sloping floor and install new carpet tiles. o Move light switches. The bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. All project related questions are to be submitted via email to pachnarr@edgecombe.edu by 1:00 PM on July 7, 2022. Bidders on this work will be required to comply with Section 109 and E.O. 11246 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must comply with Title VI of the Civil Rights Act of 1964, Anti-Kickback Act, and Contract Work Hours and Safety Standards Act. Edgecombe Community College is committed to and supportive of efforts to effectively maintain and/or increase the use of Small and Minority/Women-Owned Business and Historically Underutilized Businesses (HUB) contractparticipation for Construction Projects, services (including professional and consulting services) and commodities purchases, AND increase contract participation to offer employment, training and contracting opportunities. The College has adopted a 10% goal for HUB participation for engagement during the procurement process. No bidder may withdraw his/her bid within 60 days after the actual date of the opening thereof. The College reserves the right to waive any informalities or to reject any or all bids.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents