Similar Projects
Tom O'Leary Tennis Courts Restroom Building
Post-Bid
$320,000 est. value
Bismarck, ND 58501

Parks and Recreation Restroom
Renovation
Results
Jamestown, ND

Camp Grassick Bath & Shower Facility
New Construction - 3,180 SF
Construction
$500,000 to $1,000,000 CJ est. value
Dawson, ND 58428

NDSU - North Weible Hall Bathroom Remodel - Phase 2 - Building 057
Renovation
Bidding
Fargo, ND 58105

Hettinger Public School Pool and Locker Room Renovation
Renovation, Alteration
Post-Bid
Hettinger, ND 58639

Last Updated 09/30/2021 12:46 PM
Project Title

Y--THRO Replace 2 Comfort Stations # 57 & 66

Physical Address View project details and contacts
City, State (County) Medora, ND 58645   (Billings County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish and Replace 2 Comfort Stations at Theodore Roosevelt National Park South Unit Cottonwood Campground. The Work consists of removing the ASBESTOS Abatement by a licensed Asbestos Abatement contractor before demolition of each building can commence. Next demolition and removal of comfort stations #57 & 66. Site preparation will include leveling and compaction of site pad and all rough-in utility lines are serviceable and ready to connect to. Prior to delivery and installation of comfort stations in the spring, the contractor will ensure the building pad is prepared to receive the building. Deliver and install two prefabricated comfort stations in the South Unit’s Cottonwood Campground. Building designs will meet or exceed all ABAAS/ADA requirements and will be constructed to the floor plan design specifications prescribed in the Project Specification. These restrooms will be configured to include a total of 4 sinks, 5 toilets, one urinal, and 4 hand dryers. Also, installation of ABA accessible sidewalks around perimeter of each newly installed comfort stations.

Details

Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents