Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

DFCM Construction - DWR Logan Fes Groundwater Wells Assessment
Bidding
$180,000 est. value
Logan, UT 84321

Mexican Hat SSD Well Improvements
Post-Bid
Mexican Hat, UT

Construction of the Coldwater Well Improvement Project
Post-Bid
Mendon, UT 84325

Water System Drilling, Construction and Testing
Results
Heber, UT

F--New Westwater Well
Results
$100,000 to $250,000 est. value
Cisco, UT

South Well Chlorinator Upgrade 2020
Bidding
Grantsville, UT

Ras Pump System
Post-Bid
Provo, UT 84601

Milford Culinary Well Drilling Project 2019
Results
Less than $549,205 est. value
Milford, UT 84751

Drilling Rig and Services for Forge
Bidding
Milford, UT

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Water Treatment- Green Well
Post-Bid
Riverton, UT

Reported 11/21/2019 03:07 PM
Project Title

Ledges 1 and Tolman 4 Water Well Cathodic Protection System

Physical Address View project details and contacts
City, State (County) Saint George, UT   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of two impressed current cathodic protection systems on water wells for St. George Water Department. Each cathodic protection system will include a deep anode groundbed, dual circuit rectifier station, remote monitoring for each rectifier circuit, and electrical service to each station from existing electrical panels in the associated well house.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents