Similar Projects
Reported | 04/04/2022 01:56 PM |
Project Title | Max Abbott Middle School HVAC Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28305 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work will consist of replacing the two-pipe hydronic system in the main part of the building with a water source heat pump system. All the AHU’s, pumps, chillers, boilers and piping will be demoed and be replaced with water source heat pumps, cooling tower, boilers, boiler pumps, system pumps and Aquatherm piping. In addition, a chiller will be replaced and a boiler added to the 8th grade classroom wing. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |