Similar Projects
Rancher Complete Street Project
Infrastructure
Bidding
Jackson, WY 83001

AS/MB Meat Lab 136 Wash Down Piping Project
Infrastructure
Bidding
Laramie, WY 82072

Greys River Waterline Replacement
Infrastructure
Post-Bid
$400,000 est. value
Alpine, WY 83128

2021 McCollister Drive Water Main Replacement
Alteration
Post-Bid
Jackson, WY 83001

Completion of Raw Water Reservoir
Infrastructure
Results
Green River, WY

Pathway Vegetation Planting and Wetland Mitigation
Infrastructure
Results
Wilson, WY 83014

Afton Elementary Fire Loop Waterline 2021
Alteration
Post-Bid
Afton, WY 83110

F--Grte 225661 - Plant Salvage Along Moose Wilson
Term Contract
Results
WY

Z--Snake River Landing Improvements Phase 2, Jackson Lake Dam
Renovation, Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Moose, WY

Derington Addition Watermain Replacements
Addition
Results
Casper, WY

Cottonwood Emergency Waterline Replacement
Infrastructure
Post-Bid
Edgerton, WY 82635

2021 Water Sewer Rehabilitation Project
Infrastructure
Post-Bid
Albin, WY

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Domestic Water Piping Replacement Project
Alteration
Post-Bid
Evanston, WY 82930

Big Horn Regional Waterline to Burlington
Infrastructure
Post-Bid
Worland, WY

Last Updated 01/21/2022 03:06 PM
Project Title

Leavitt Reservoir Expansion Project

Physical Address View project details and contacts
City, State (County) Greybull, WY   (Big Horn County)
Category(s) Environmental, Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Dock/Pier/Marine, Water Lines, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000,000 to $50,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the construction of a new earthen embankment dam, water conveyance pipelines, wetlands mitigation area, and recreation facilities. The major items of work include: - Construction of a zoned earthen embankment dam that is up to approximately 85 feet tall and 4,200 feet long and consists of approximately 1.5 million cubic yards of primarily locally borrowed fill. - Construction of an outlet works consisting of 42-inch diameter steel pipe and an approximately 90-foot-tall combination gate and spillway tower. - Construction of approximately 9,200 feet of a 42-inch-diameter supply pipeline and associated diversion structure on Beaver Creek. - Construction of approximately 17,700 feet of a 36-inch diameter transfer pipeline, associated diversion structure on Beaver Creek, and multiple discharge structures. - Construction of an approximately 23-acre wetlands mitigation area. - Construction of recreation facilities including a concrete boat ramp. Critical work categories include general contractor, earthwork, pipeline installation, and concrete construction of the gate tower.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Subsurface Investigation, Water Remediation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents