Similar Projects
L Richardson Hospital
Renovation
Conception
Greensboro, NC 27401

Appert Farm
New Construction
Conception
Greensboro, NC 27405

Talbot Court
New Construction
Design
Greensboro, NC 27409

Abbey Crossing
New Construction
Design
High Point, NC 27265

Redhill Pointe
New Construction
Post-Bid
Greensboro, NC 27407

BB and T Building Wellness Center Renovation Phase 2
New Construction, Renovation
Post-Bid
Greensboro, NC 27401

Carroll at Bellemeade
New Construction - 256,282 SF
Construction
$50,000,000 est. value
Greensboro, NC 27401

Elmsley Trail
New Construction
Construction
Greensboro, NC 27406

The Lofts at Elmsley Crossing
New Construction
Conception
Greensboro, NC 27406

Greensboro Country Club
Renovation, Addition - 52,533 SF
Post-Bid
Greensboro, NC 27408

Avondale Trace
New Construction
Construction
High Point, NC 27265

Church Avenue Plaza
New Construction - 92,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
High Point, NC 27262

Mill House
Renovation - 94,420 SF
Post-Bid
Greensboro, NC 27405

River Landings Wellness Center
Addition
Construction
$5,500,000 est. value
Colfax, NC 27235

Gateway Park
New Construction
Conception
Greensboro, NC 27406

Last Updated 01/20/2020 10:48 AM
Project Title

Revolution Mill Fitness Relocation

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27405   (Guilford County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Misc. Recreational
Contracting Method
Project Status Construction Commenced October 2019, Construction Complete as of January 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be run as one contract under 4 separate permits but we need to submit our pricing to the owner broken down into 4 separate prices 1) Color Works (including masonry demising wall and power/furring/drywall on Color Works side of the wall, – also include Alternate pricing for Bulkhead, Drop Ceiling & associated FP,M,&E work) 2) Fitness Center (including power/furring/drywall on Fitness Center side of the wall) 3) Event Space (include filling in floor boxes, brick up of arch opening, demising wall and power/drywall on event side, relocation of emergency backup for lights to event center) 4) Studio Apartment (include rework at hallway, filling in floor boxes, and power/drywall on Apartment side of demising wall)

Details

8,238 SF - 1 Fitness Center, 1 Story Above Grade, 2,052 SF Renovation, 1 Apartments/Condominiums, 907 SF Renovation, 1 Misc. Recreational, 3,285 SF Renovation, 1 Misc. Recreational, 1,994 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents