Similar Projects
1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

1130 North Drainage Improvements - City of Saint George
Infrastructure
Conception
$1,400,000 CJ est. value
St George, UT 84770

White Dome Commercial
New Construction, Infrastructure - 30,000 SF
Design
$8,000,000 CJ est. value
St George, UT 84770

Monopole Tower
New Construction, Infrastructure - 100 SF
Design
$53,700 CJ est. value
St George, UT 84770

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sky Mountain Power Substation Grading and Utilities
Infrastructure
Post-Bid
Hurricane, UT

Onset Financial Core & Shell Bid Package #4
New Construction, Infrastructure - 58,000 SF
Post-Bid
$12,000,000 CJ est. value
St George, UT 84770

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

SGES Bore Project - Riverside Drive
Infrastructure
Results
Saint George, UT 84790

Black Desert Resort
New Construction
Construction
Ivins, UT

Building 4 Riverwoods Mill
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
St George, UT 84770

Lugano Landing (PA-4) at Divario
New Construction, Infrastructure
Pending Verification
$49,000,000 CJ est. value
St George, UT 84770

Zion Guru
New Construction, Infrastructure - 3,416 SF
Pending Verification
$900,000 CJ est. value
Springdale, UT 84767

Bloomington Pickleball Courts - City of Saint George
Infrastructure
Conception
$1,174,041 CJ est. value
St George, UT 84790

3000 East Widening - 1580 South To Seeg Drive - City of Saint George
Infrastructure
Design
$13,100,000 CJ est. value
St George, UT 84790

Last Updated 02/21/2023 03:34 AM
Project Title

Sand Hollow North Dam to West Dam Pipeline Installation Project

Physical Address View project details and contacts
City, State (County) St George, UT 84770   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $645,584 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 20, 2023, project was awarded to Feller Enterprises, awarded amount is $645,583.54.** The contract consists of installing approximately 11,000 feet of owner furnished 24" and smaller ductile iron pipe and appurtenances, furnishing and installing approximately 12,300 feet of 1 1/4 " HDPE communication conduit with pull boxes, five tie-ins to existing pipelines, earthwork for a 500 foot segment of access roadway, and other miscellaneous related work. Bids may be rejected for any of the reasons set forth in Utah Code Annotated, Section 63G-6a-120.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents