Similar Projects
Sucker Creek Bridge Culvert Replacement
Infrastructure
Bidding
$183,000 est. value
Mahnomen, MN

Construct Left Turn Lanes and Right Turn Lanes
Renovation, Infrastructure
Bidding
$30,000,000 est. value
Aitkin, MN 56431

Ryan Drive and Keller Parkway Conveyance Upgrades
Post-Bid
$808,000 est. value
Little Canada, MN 55117

Road Materials
Post-Bid
Moorhead, MN

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Interstate State Park Large and Small Scale Rock Removal
Results
Taylors Falls, MN

Len Hardy Memorial ATV/Snowmobile Trail
Infrastructure
Bidding
$100,000 est. value
Grand Rapids, MN

CSAH 15 Culvert Replacement
Infrastructure
Post-Bid
Waseca, MN

Old Village Phase 5 And 6 Street, Drainage and Utility Improvements
Results
MN

Sunny Beach Road - Full Depth Reclamation, Grading, Subgrade Correction, Pipe Culverts, Bituminous Paving, Signing and Pavement Markings
Infrastructure
Bidding
$50,000 est. value
Harris, MN 55744

Elmer L Andersen Building Water Intrusion Repairs
Infrastructure
Post-Bid
$34,000 est. value
Saint Paul, MN 55101

Nicollet County Ditch No. 77 Improvement
Results
Less than $295,000 est. value
Lafayette, MN

Phase 7A Closure and Cells 5C-7C Slope Liner Construction
Infrastructure
Bidding
$637,350 est. value
Faribault, MN

Bridge / Box Culvert Replacement
Renovation, Infrastructure
Post-Bid
Williams, MN

Wastewater Stabilization Pond Expansion
Results
$3,000,000 est. value
Deer River, MN

Last Updated 06/09/2022 06:07 AM
Project Title

North Street Drainage Outfall Improvements

Physical Address View project details and contacts
City, State (County) Kenyon, MN 55946   (Goodhue County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $380,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Erosion Control - Temporary, Culverts, Waterways, Stormwater Channels, Grubbing & Clearing, Erosion Control/Slope, Bank Stabilization, Drainage, Dredging, Ditches and Canals. Description: - Mobilization 1 LS - Clearing & Grubbing 1 LS - Site Grading 1 LS - Remove Sewer Pipe (Storm) 103 LF - 15" CAS Pipe Pipe Culver 275 LF - 15" CAS Pipe Apron 4 LF - Construction Drainage Structure DES 48-4020 18.37 LF - Random RIPRAP Class III 54 TON - Sediment Control Log Type Wood Chip/Compost 300 LF.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents